Quick answers
What is this project?
Greenfield Plant for 10,00,000 TPA Pickling Line with other facilities such as HR Slitter, Cut-to-Length, Coil Preparation Line by BMW Industries Limited at Plot No. IV/B-1 (P), Phase IV, Balidih Industrial Area, Bokaro Steel City, Dist. Bokaro – 827014, Jharkhand is an approved industrial project in Bokaro Steel City, Chas, Bokaro, Jharkhand. The site covers 4.8 acres.
Who is building it?
The applicant is Bmw Industries Limited.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 18 Jun 2026), as of 27 Nov 2026.
Where is it?
In Bokaro Steel City, Chas, Bokaro, Jharkhand.
How big is it?
It has a stated cost of ₹85 crore and a site of 4.8 acres.
When was it filed?
The application was filed on 21 Apr 2026.
Project details
| Official title | Establishment of Greenfield Plant for 10,00,000 TPA Pickling Line with other facilities such as HR Slitter, Cut-to-Length, Coil Preparation Line by BMW Industries Limited at Plot No. IV/B-1 (P), Phase IV, Balidih Industrial Area, Bokaro Steel City, Dist. Bokaro – 827014, Jharkhand |
|---|---|
| Status | Environmental approval granted |
| Status since | 18 Jun 2026 |
| Application filed | 21 Apr 2026 |
| Approval sought | Environmental approval |
| Application type | Amendment |
| Sector | Industry |
| Applicant | Bmw Industries Limited |
| Land area | 4.8 acres (2 ha) |
| Project cost | ₹85 crore |
| Village / locality | Bokaro Steel City |
| Taluk / tehsil | Chas |
| District | Bokaro |
| State | Jharkhand |
| Location from | Site boundary on record |
| Our reference | WID-JH-02052 |
All filings for this project
This project has 3 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Amendment filed 21 Apr 2026 (this page) | Environmental approval granted | 4.8 acres | ₹85 crore |
| New project filed 6 Oct 2025 | Environmental approval granted | 4.8 acres | ₹85 crore |
| Early planning filed 11 Mar 2025 | Cleared for impact study | 4.8 acres | ₹85 crore |
In context
27 applications in Bokaro since January 2022 are in the same category (Industry): 16 approved, 4 filed or under review, and 7 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 4.8 acres, this one is smaller than 63% of them.
26 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Bokaro Steel City, Chas, Bokaro, Jharkhand. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Greenfield Plant for 10,00,000 TPA Pickling Line with other facilities such as… — environmental approval granted, 0 m away
- Greenfield Plant for 10,00,000 TPA Pickling Line with other facilities such as… — cleared for impact study, 0 m away
- Ferro Alloys Plant (Greenfield Project) for production of 32,400 TPA Ferro… — environmental approval granted, 300 m away
- Ferro Alloys Plant (Greenfield Project) for production of 32,400 TPA Ferro… — withdrawn, 300 m away
- Ferro Alloys Plant (Greenfield Project) for production of 32,400 TPA Ferro… — lapsed, 300 m away
- Greenfield Ferro Alloys Plant for production of 31,000 TPA (max.) Ferro Alloys… — environmental approval granted, 600 m away
- Greenfield Ferro Alloys Plant for production of 31,000 TPA (max.) Ferro Alloys… — cleared for impact study, 600 m away
- Greenfield Ferro Alloys Plant for production of 40,000 TPA (Max.) Ferro Alloys… — cleared for impact study, 750 m away
3 Bmw Industries projects in Bokaro
All 7 Bmw Industries projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.