Proposed Integrated steel plant with Captive Power Plant (50 MW) by Narsingh Ispat Ltd is an approved industrial project in Khunti, Chandil, Saraikela-Kharsawan, Jharkhand. The site covers 27.7 acres.
Who is building it?
The applicant is Narsingh Ispat Limited.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 4 May 2026), as of 27 Nov 2026.
Where is it?
In Khunti, Chandil, Saraikela-Kharsawan, Jharkhand.
How big is it?
It has a stated cost of ₹179 crore and a site of 27.7 acres.
When was it filed?
The application was filed on 8 Nov 2024.
Project details
| Official title | Proposed Integrated steel plant with Captive Power Plant (50 MW) at village Khunti, Kandra Road, P.O. Chandil, District - Saraikela Kharswan, Jharkhand by Narsingh Ispat Ltd |
|---|---|
| Status | Environmental approval granted |
| Status since | 4 May 2026 |
| Application filed | 8 Nov 2024 |
| Approval sought | Environmental approval |
| Application type | Other |
| Sector | Industry |
| Applicant | Narsingh Ispat Limited |
| Land area | 27.7 acres (11.2 ha) |
| Project cost | ₹179 crore |
| Village / locality | Khunti |
| Taluk / tehsil | Chandil |
| District | Saraikela-Kharsawan |
| State | Jharkhand |
| Location from | Site boundary on record |
| Our reference | WID-JH-00635 |
In context
47 applications in Saraikela-Kharsawan since January 2022 are in the same category (Industry): 24 approved, 11 filed or under review, and 12 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 27.7 acres, this one is smaller than 55% of them.
6 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Khunti, Chandil, Saraikela-Kharsawan, Jharkhand. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Expansion of existing steel plant by enhancement of Pig iron production from… — environmental approval granted, 0 m away
- Expansion of existing steel plant by enhancement of Pig iron production from… — cleared for impact study, 0 m away
- Transfer of Environment Clearance "Expansion of Integrated Steel Plant Project — lapsed, 3.3 km away
- Expansion of the Existing Project Land From 2.6365 Ha to 6.7177 Ha for… — lapsed, 3.9 km away
- Expansion of the Existing Project Land From 2.6365 Ha to 6.7177 Ha for… — cleared for impact study, 3.9 km away
- "Expansion at existing site by new installation of Ferro alloy (Si-Mn) 30,000… — withdrawn, 3.9 km away
- Rudia Stone Mine — environmental approval granted, 7.2 km away
- 220 Kv D/C Chandil to Chandil Transmission Line — initial checks, 7.9 km away