Environmental approval grantedIndustry · Saraikela-Kharsawan, Jharkhand

Proposed Integrated steel plant with Captive Power Plant (50 MW) by Narsingh Ispat Ltd

Proposed Integrated steel plant with Captive Power Plant (50 MW) by Narsingh Ispat Ltd is an approved industrial project in Khunti, Chandil, Saraikela-Kharsawan, Jharkhand. The site covers 27.7 acres. Its stated project cost is ₹179 crore. As of 27 Nov 2026, its status is “Environmental approval granted” (since 4 May 2026).

See it on the live map All projects in Saraikela-Kharsawan

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Proposed Integrated steel plant with Captive Power Plant (50 MW) by Narsingh Ispat Ltd is an approved industrial project in Khunti, Chandil, Saraikela-Kharsawan, Jharkhand. The site covers 27.7 acres.

Who is building it?

The applicant is Narsingh Ispat Limited.

Has it been approved?

Yes. Its status is “Environmental approval granted” (since 4 May 2026), as of 27 Nov 2026.

Where is it?

In Khunti, Chandil, Saraikela-Kharsawan, Jharkhand.

How big is it?

It has a stated cost of ₹179 crore and a site of 27.7 acres.

When was it filed?

The application was filed on 8 Nov 2024.

Project details

Official titleProposed Integrated steel plant with Captive Power Plant (50 MW) at village Khunti, Kandra Road, P.O. Chandil, District - Saraikela Kharswan, Jharkhand by Narsingh Ispat Ltd
StatusEnvironmental approval granted
Status since4 May 2026
Application filed8 Nov 2024
Approval soughtEnvironmental approval
Application typeOther
SectorIndustry
ApplicantNarsingh Ispat Limited
Land area27.7 acres (11.2 ha)
Project cost₹179 crore
Village / localityKhunti
Taluk / tehsilChandil
DistrictSaraikela-Kharsawan
StateJharkhand
Location fromSite boundary on record
Our referenceWID-JH-00635

In context

47 applications in Saraikela-Kharsawan since January 2022 are in the same category (Industry): 24 approved, 11 filed or under review, and 12 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 27.7 acres, this one is smaller than 55% of them.

6 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Khunti, Chandil, Saraikela-Kharsawan, Jharkhand. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

All 3 Narsingh Ispat projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.