Quick answers
What is Rudia Stone Mine?
Rudia Stone Mine is an approved mining project in Rudih, Chandil, Saraikela-Kharsawan, Jharkhand. The site covers 17.1 acres.
Who is building it?
The applicant is Kamal Prasad.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 23 Dec 2024), as of 27 Nov 2026.
Where is it?
In Rudih, Chandil, Saraikela-Kharsawan, Jharkhand.
How big is it?
It has a stated cost of ₹76 lakh and a site of 17.1 acres.
When was it filed?
The application was filed on 22 Oct 2024.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 23 Dec 2024 |
| Application filed | 22 Oct 2024 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Kamal Prasad |
| Land area | 17.1 acres (6.9 ha) |
| Project cost | ₹76 lakh |
| Village / locality | Rudih |
| Taluk / tehsil | Chandil |
| District | Saraikela-Kharsawan |
| State | Jharkhand |
| Location from | Site boundary on record |
| Our reference | WID-JH-00691 |
In context
44 applications in Saraikela-Kharsawan since January 2022 are in the same category (Mining): 33 approved, 4 filed or under review, and 7 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 17.1 acres, this one is larger than 86% of them.
No other mining lease on record has applied within 5 km of this site.
Where it is
Rudih, Chandil, Saraikela-Kharsawan, Jharkhand. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- 220 Kv D/C Chandil to Chandil Transmission Line — initial checks, 2.1 km away
- Expansion of the Existing Project Land From 2.6365 Ha to 6.7177 Ha for… — lapsed, 4 km away
- Expansion of the Existing Project Land From 2.6365 Ha to 6.7177 Ha for… — cleared for impact study, 4 km away
- "Expansion at existing site by new installation of Ferro alloy (Si-Mn) 30,000… — withdrawn, 4 km away
- Transfer of Environment Clearance "Expansion of Integrated Steel Plant Project — lapsed, 4.8 km away
- Proposed expansion of existing steel plant to Integrated Steel Plant through… — under environmental review, 5.9 km away
- Proposed expansion of existing steel plant to Integrated Steel Plant through… — cleared for impact study, 5.9 km away
- Proposed expansion of existing sponge iron plant through installation of 2 X… — lapsed, 5.9 km away