What is this project?
Proposed Modernization cum Expansion of Integrated Steel Plant with Sponge Iron (DRI) 0.231 MTPA to 0.561 MTPA, Steel Billets (MS Billets) 0.198 MTPA to 0.435 MTPA, Rolling Mill (MS Bars & Structural Steel) 0.192 MTPA to 0.425 MTPA with Iron Ore crusher 0.841 MTPA, Ferro alloys 0.148 MTPA, Slag Crusher 0.198 MTPA and Captive Power Plant 30 MW to 110 MW with Increase in Land area from 27.34 ha to 30.45 ha by M/s Krishna Sponge Iron and Power Private Limited is a proposed industrial project in Kamalpur, Saraikela, Saraikela-Kharsawan, Jharkhand. The site covers 75.2 acres.
Who is building it?
The applicant is Krishna Sponge Iron and Power Private Limited.
Has it been approved?
Not yet. The application is still under review: its status is “Under environmental review”, as of 27 Nov 2026.
Where is it?
In Kamalpur, Saraikela, Saraikela-Kharsawan, Jharkhand.
How big is it?
It has a stated cost of ₹2,126 crore and a site of 75.2 acres.
When was it filed?
The application was filed on 19 Nov 2026.
Project details
| Status | Under environmental review |
|---|---|
| Status since | 26 Nov 2026 |
| Application filed | 19 Nov 2026 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | Krishna Sponge Iron and Power Private Limited |
| Land area | 75.2 acres (30.5 ha) |
| Project cost | ₹2,126 crore |
| Village / locality | Kamalpur |
| Taluk / tehsil | Saraikela |
| District | Saraikela-Kharsawan |
| State | Jharkhand |
| Location from | Site boundary on record |
| Our reference | WID-JH-02723 |
In context
47 applications in Saraikela-Kharsawan since January 2022 are in the same category (Industry): 24 approved, 11 filed or under review, and 12 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 75.2 acres, this one is larger than 68% of them.
9 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Kamalpur, Saraikela, Saraikela-Kharsawan, Jharkhand. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Integrated Steel Plant with Sponge Iron (DRI) 2,31,000 TPA, Steel… — environmental approval granted, 50 m away
- Proposed Integrated Steel Plant with Sponge Iron (DRI) 2,31,000 TPA, Steel… — cleared for impact study, 50 m away
- Expansion of Srijan Steel and Power Industries Private Limited by Production… — lapsed, 950 m away
- Expansion of Srijan Steel and Power Industries Private Limited by Production… — cleared for impact study, 950 m away
- Integrated Common Hazardous Waste Treatment, Storage and Disposal Facility — lapsed, 2.3 km away
- Inclusion of Common Bio-Medical Waste Treatment Facility in Hazardous Waste… — lapsed, 2.3 km away
- Inclusion of Common Bio-Medical Waste Treatment Facility in Hazardous Waste… — lapsed, 2.3 km away
- Proposed Expansion of Common Hazardous Waste Treatment Storage and Disposal… — under environmental review, 2.3 km away
More from Krishna Sponge Iron and Power Private Limited in Saraikela-Kharsawan
- Proposed Integrated Steel Plant with Sponge Iron (DRI) 2,31,000 TPA, Steel… — environmental approval granted
- Proposed Integrated Steel Plant with Sponge Iron (DRI) 2,31,000 TPA, Steel… — cleared for impact study
All 3 Krishna Sponge Iron projects across India
About this information