What is Developing? Open the mapMap

Cleared for impact studyIndustry · Saraikela-Kharsawan, Jharkhand

Expansion of Srijan Steel and Power Industries Private Limited by Production of 0.2 Mtpa of Rolled Products

Expansion of Srijan Steel and Power Industries Private Limited by Production of 0.2 Mtpa of Rolled Products is a proposed industrial project in Kamalpur, Saraikela, Saraikela-Kharsawan, Jharkhand. The site covers 44.9 acres. Its stated project cost is ₹3.6 crore. As of 27 Nov 2026, its status is “Cleared for impact study” (since 29 Apr 2025).

See it on the live map All projects in Saraikela-Kharsawan

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Expansion of Srijan Steel and Power Industries Private Limited by Production of 0.2 Mtpa of Rolled Products is a proposed industrial project in Kamalpur, Saraikela, Saraikela-Kharsawan, Jharkhand. The site covers 44.9 acres.

Who is building it?

The applicant is Srijan Steel and Power Industries Private Limited.

Has it been approved?

Yes. Its status is “Cleared for impact study” (since 29 Apr 2025), as of 27 Nov 2026.

Where is it?

In Kamalpur, Saraikela, Saraikela-Kharsawan, Jharkhand.

How big is it?

It has a stated cost of ₹3.6 crore and a site of 44.9 acres.

When was it filed?

The application was filed on 22 Apr 2025.

Project details

StatusCleared for impact study
Status since29 Apr 2025
Application filed22 Apr 2025
Approval soughtEnvironmental approval
Application typeEarly planning
SectorIndustry
ApplicantSrijan Steel and Power Industries Private Limited
Land area44.9 acres (18.2 ha)
Project cost₹3.6 crore
Village / localityKamalpur
Taluk / tehsilSaraikela
DistrictSaraikela-Kharsawan
StateJharkhand
Location fromSite boundary on record
Our referenceWID-JH-01654

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
Expansion filed 27 Aug 2026Lapsed44.9 acres₹3.6 crore
Early planning filed 22 Apr 2025 (this page)Cleared for impact study44.9 acres₹3.6 crore

In context

47 applications in Saraikela-Kharsawan since January 2022 are in the same category (Industry): 24 approved, 11 filed or under review, and 12 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 44.9 acres, this one is larger than 51% of them.

8 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Kamalpur, Saraikela, Saraikela-Kharsawan, Jharkhand. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.