Quick answers
What is this project?
Proposed expansion of existing sponge iron plant through installation of 2 X 600 TPD DRI kilns is a lapsed industrial project in Kanki, Adityapur(Gamharia), Saraikela-Kharsawan, Jharkhand. The site covers 86 acres.
Who is building it?
The applicant is Nilachal Iron and Power LTD.
Has it been approved?
No. The application was lapsed on 29 Oct 2024, so it is no longer under consideration.
Where is it?
In Kanki, Adityapur(Gamharia), Saraikela-Kharsawan, Jharkhand.
How big is it?
It has a stated cost of ₹709 crore and a site of 86 acres.
When was it filed?
The application was filed on 12 May 2023.
Project details
| Official title | Proposed expansion of existing sponge iron plant through installation of 2 X 600 TPD DRI kilns along with installation of Steel Melting Shop (3 X 10 T & 4 X 15 T Induction Furnaces with matching LRF & CCM and Metal Recovery Plant), Rolling Mill (2,30,000 TPA) and 49 MW (37 MW WHRB based + 12 MW AFBC based) capacity Captive Power Plant |
|---|---|
| Status | Lapsed |
| Status since | 29 Oct 2024 |
| Application filed | 12 May 2023 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | Nilachal Iron and Power LTD |
| Land area | 86 acres (34.8 ha) |
| Project cost | ₹709 crore |
| Village / locality | Kanki |
| Taluk / tehsil | Adityapur(Gamharia) |
| District | Saraikela-Kharsawan |
| State | Jharkhand |
| Location from | Site boundary on record |
| Our reference | WID-JH-00329 |
In context
47 applications in Saraikela-Kharsawan since January 2022 are in the same category (Industry): 24 approved, 11 filed or under review, and 12 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 86 acres, this one is larger than 70% of them.
11 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Kanki, Adityapur(Gamharia), Saraikela-Kharsawan, Jharkhand. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed expansion of existing steel plant to Integrated Steel Plant through… — under environmental review, 0 m away
- Proposed expansion of existing steel plant to Integrated Steel Plant through… — cleared for impact study, 0 m away
- Amendment in Existing 1.2 MTPA Pellet Plant with Installation of PGP (Producer… — environmental approval granted, 1.8 km away
- Change in the Raw Material Mix by Inclusion of Ld Sludge for Production of 1.2… — initial checks, 1.8 km away
- Change in the raw material mix by replacement of Domestic Scrap with Imported… — initial checks, 2.3 km away
- Expansion of an Integrated Mini Steel Plant by Increasing the Production of… — lapsed, 2.3 km away
- 132KV D/C Chandil Rajkharsawan Lilo at Kandra Transmission Line — more information requested, 3.7 km away
- Bhadudih Stone Deposit (0.708 Ha) — environmental approval granted, 3.7 km away
More from Nilachal Iron and Power LTD in Saraikela-Kharsawan
- Proposed expansion of existing steel plant to Integrated Steel Plant through… — under environmental review
- Proposed expansion of existing steel plant to Integrated Steel Plant through… — cleared for impact study
All 3 Nilachal Iron and Power projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.