Project details
| Status | Lapsed |
|---|---|
| Status since | 29 Oct 2024 |
| Application filed | 25 Jan 2024 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Deoraj Agarwal |
| Land area | 5 acres (2 ha) |
| Project cost | ₹8 lakh |
| Village / locality | Mangra |
| Taluk / tehsil | Barwadih |
| District | Latehar |
| State | Jharkhand |
| Location from | Site boundary on record |
| Our reference | WID-JH-00956 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 25 Jan 2024 (this page) | Lapsed | 5 acres | ₹8 lakh |
| New project filed 20 Dec 2023 | Lapsed | 5 acres | ₹8 lakh |
In context
76 applications in Latehar since January 2022 are in the same category (Mining): 47 approved, 17 filed or under review, and 12 withdrawn, lapsed or rejected. The approved ones took a median of 43 days from filing to approval. At 5 acres, this one is smaller than 62% of them.
No other mining lease on record is within 500 m of this site; 1 has applied within 5 km.
Where it is
Mangra, Barwadih, Latehar, Jharkhand. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Close to RVNL Kumandih-Barwadih Railway Diversion: 18.5 km Railway Line in Latehar, Jharkhand (13.9 km away).
Other projects nearby
- Brick Soil Mining For M/s Dayal Bricks — lapsed, 0 m away
- Murgidih Bricks Clay Deposit — environmental approval granted, 950 m away
- Strengthening -Widening & Reconstruction of Ked(SH-9) to Bhaisakharh via… — under forest review, 12.5 km away
- Strengthening -Widening & Reconstruction of Ked(SH-9) to Bhaisakharh via… — under wildlife review, 12.5 km away
- Renovation of Harinamar M.I Scheme, Block-Barwadih, District-Latehar — decision issued, 13.9 km away
- Renovation of Harinamar M.I Scheme, Block-Barwadih, Dist-Latehar — more information requested, 13.9 km away
- Diversion of the entire Railway network between Kumandih and Barwadih (18.5… — withdrawn, 13.9 km away
- Diversion of the entire Railway network between Kumandih and Barwadih (18.5… — not approved, 13.9 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.