Quick answers
What is Jamdah Brick Soil Mining?
Jamdah Brick Soil Mining is an approved mining project in Champad, Kuchai, Saraikela-Kharsawan, Jharkhand. The site covers 3.2 acres.
Who is building it?
The applicant is Madan Munda.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 30 Oct 2025), as of 27 Nov 2026.
Where is it?
In Champad, Kuchai, Saraikela-Kharsawan, Jharkhand.
How big is it?
It has a stated cost of ₹14 lakh and a site of 3.2 acres.
When was it filed?
The application was filed on 3 Sept 2025.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 30 Oct 2025 |
| Application filed | 3 Sept 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Madan Munda |
| Land area | 3.2 acres (1.3 ha) |
| Project cost | ₹14 lakh |
| Village / locality | Champad |
| Taluk / tehsil | Kuchai |
| District | Saraikela-Kharsawan |
| State | Jharkhand |
| Location from | Site boundary on record |
| Our reference | WID-JH-01276 |
In context
44 applications in Saraikela-Kharsawan since January 2022 are in the same category (Mining): 33 approved, 4 filed or under review, and 7 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 3.2 acres, this one is smaller than 75% of them.
No other mining lease on record has applied within 5 km of this site.
Where it is
Champad, Kuchai, Saraikela-Kharsawan, Jharkhand. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Haribhanja Brick Soil Mining — environmental approval granted, 8.6 km away
- Parmadih Bricks Clay Deposit — lapsed, 9.3 km away
- Expansion of Standalone Clinker Grinding Unit for manufacturing of Cement… — environmental approval granted, 15.3 km away
- Expansion of 0.35 MTPA DRI & 60 MW CPP in 37.313 ha into "Seraikela-Kharsawan… — cleared for impact study, 18 km away
- Integrated Steel Plant (2.5 MTPA) — environmental approval granted, 18.1 km away
- 132 KV DC Chouka Tamar Transmission Line — more information requested, 18.3 km away
- Proposed Integrated Steel Plant with Sponge Iron (DRI) 2,31,000 TPA, Steel… — environmental approval granted, 21.1 km away
- Proposed Integrated Steel Plant with Sponge Iron (DRI) 2,31,000 TPA, Steel… — cleared for impact study, 21.1 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.