What is Developing? Open the mapMap

Cleared for impact studyIndustry · Saraikela-Kharsawan, Jharkhand

Proposed Integrated Steel Plant with Sponge Iron (DRI) 2,31,000 TPA, Steel Billets (MS Billets) 1,98,000 TPA, Rolling Mill (MS Bars & Structural Steel) 1,92,233 TPA and 30 MW Captive Power Plant by M/S Krishna Sponge Iron & Power Pvt. Ltd.

Proposed Integrated Steel Plant with Sponge Iron (DRI) 2,31,000 TPA, Steel Billets (MS Billets) 1,98,000 TPA, Rolling Mill (MS Bars & Structural Steel) 1,92,233 TPA and 30 MW Captive Power Plant by M/S Krishna Sponge Iron & Power Pvt. Ltd is a proposed industrial project in Kamalpur, Saraikela, Saraikela-Kharsawan, Jharkhand. The site covers 67.6 acres. Its stated project cost is ₹515 crore. As of 27 Nov 2026, its status is “Cleared for impact study” (since 28 Apr 2025).

See it on the live map All projects in Saraikela-Kharsawan

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Proposed Integrated Steel Plant with Sponge Iron (DRI) 2,31,000 TPA, Steel Billets (MS Billets) 1,98,000 TPA, Rolling Mill (MS Bars & Structural Steel) 1,92,233 TPA and 30 MW Captive Power Plant by M/S Krishna Sponge Iron & Power Pvt. Ltd is a proposed industrial project in Kamalpur, Saraikela, Saraikela-Kharsawan, Jharkhand. The site covers 67.6 acres.

Who is building it?

The applicant is Krishna Sponge Iron and Power Private Limited.

Has it been approved?

Yes. Its status is “Cleared for impact study” (since 28 Apr 2025), as of 27 Nov 2026.

Where is it?

In Kamalpur, Saraikela, Saraikela-Kharsawan, Jharkhand.

How big is it?

It has a stated cost of ₹515 crore and a site of 67.6 acres.

When was it filed?

The application was filed on 1 Mar 2025.

One of 2 filings for this project. The project's main page, with every filing and where each stands: Proposed Integrated Steel Plant with Sponge Iron (DRI) 2,31,000 TPA, Steel Billets (MS…

Project details

StatusCleared for impact study
Status since28 Apr 2025
Application filed1 Mar 2025
Approval soughtEnvironmental approval
Application typeEarly planning
SectorIndustry
ApplicantKrishna Sponge Iron and Power Private Limited
Land area67.6 acres (27.3 ha)
Project cost₹515 crore
Village / localityKamalpur
Taluk / tehsilSaraikela
DistrictSaraikela-Kharsawan
StateJharkhand
Location fromSite boundary on record
Our referenceWID-JH-01551

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 12 Feb 2026Environmental approval granted67.6 acres₹515 crore
Early planning filed 1 Mar 2025 (this page)Cleared for impact study67.6 acres₹515 crore

In context

47 applications in Saraikela-Kharsawan since January 2022 are in the same category (Industry): 24 approved, 11 filed or under review, and 12 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 67.6 acres, this one is larger than 64% of them.

8 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Kamalpur, Saraikela, Saraikela-Kharsawan, Jharkhand. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Krishna Sponge Iron and Power Private Limited in Saraikela-Kharsawan

All 3 Krishna Sponge Iron projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.