Expansion of the existing steel plant for final production of 315,000 TPA Sponge Iron, 435,600 TPA MS Billets through IF, LRF and CCM, 40 MW CPP

Expansion of the existing steel plant for final production of 315,000 TPA Sponge Iron, 435,600 TPA MS Billets through IF, LRF and CCM, 40 MW CPP is a proposed industrial project in Kamta, Gola, Ramgarh, Jharkhand. The site covers 75.1 acres. Its stated project cost is ₹1,078.9 crore. As of 27 Nov 2026, its status is “Cleared for impact study” (since 19 Mar 2026).

See it on the live map All projects in Ramgarh

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Expansion of the existing steel plant for final production of 315,000 TPA Sponge Iron, 435,600 TPA MS Billets through IF, LRF and CCM, 40 MW CPP is a proposed industrial project in Kamta, Gola, Ramgarh, Jharkhand. The site covers 75.1 acres.

Who is building it?

The applicant is Brahmaputra Metallics Limited.

Has it been approved?

Yes. Its status is “Cleared for impact study” (since 19 Mar 2026), as of 27 Nov 2026.

Where is it?

In Kamta, Gola, Ramgarh, Jharkhand.

How big is it?

It has a stated cost of ₹1,078.9 crore and a site of 75.1 acres.

When was it filed?

The application was filed on 10 Mar 2026.

Project details

Official titleExpansion of the existing steel plant for final production of 315,000 TPA Sponge Iron, 435,600 TPA MS Billets through IF, LRF and CCM, 40 MW CPP along with installation of 450,000 TPA Pig Iron Plant, 383,200 TPA Sinter Plant, 350,000 TPA SS Billets through EAF, LRF & CCM, 28,500 TPA (max) Ferro Alloys, 300,000 TPA Rolling Mill and 12,00,000 TPA Pellet Plant along with allied facilities by Brahmaputra Metallics Limited at Village Kamta, Dist Ramgarh, Jharkhand
StatusCleared for impact study
Status since19 Mar 2026
Application filed10 Mar 2026
Approval soughtEnvironmental approval
Application typeEarly planning
SectorIndustry
ApplicantBrahmaputra Metallics Limited
Land area75.1 acres (30.4 ha)
Project cost₹1,078.9 crore
Village / localityKamta
Taluk / tehsilGola
DistrictRamgarh
StateJharkhand
Location fromSite boundary on record
Our referenceWID-JH-01958

In context

30 applications in Ramgarh since January 2022 are in the same category (Industry): 12 approved, 10 filed or under review, and 8 withdrawn, lapsed or rejected. The approved ones took a median of 31 days from filing to approval. At 75.1 acres, this one is larger than 73% of them.

2 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Kamta, Gola, Ramgarh, Jharkhand. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.