Quick answers
What is Change in Land Use of Rajrappa Ocp?
Change in Land Use of Rajrappa Ocp is a lapsed mining project in Gaurabera, Chitarpur, Ramgarh, Jharkhand. The site covers 609.1 acres.
Who is building it?
The applicant is Central Coalfields Limited.
Has it been approved?
No. The application was lapsed on 12 Mar 2025, so it is no longer under consideration.
Where is it?
In Gaurabera, Chitarpur, Ramgarh, Jharkhand.
How big is it?
It has a stated cost of ₹510 crore; a site of 609.1 acres and 39.2 acres (15.9 ha) of forest land.
When was it filed?
The application was filed on 5 Apr 2024.
Project details
| Status | Lapsed |
|---|---|
| Status since | 12 Mar 2025 |
| Application filed | 5 Apr 2024 |
| Approval sought | Forest land use |
| Application type | Change of use |
| Sector | Mining |
| Applicant | Central Coalfields Limited |
| Land area | 609.1 acres (246.5 ha) |
| Forest land | 39.2 acres (15.9 ha) |
| Project cost | ₹510 crore |
| Village / locality | Gaurabera |
| Taluk / tehsil | Chitarpur |
| District | Ramgarh |
| State | Jharkhand |
| Location from | Site boundary on record |
| Our reference | WID-JH-02511 |
In context
59 applications in Ramgarh since January 2022 are in the same category (Mining): 39 approved, 7 filed or under review, and 13 withdrawn, lapsed or rejected. The approved ones took a median of 42 days from filing to approval. At 609.1 acres, this one is larger than 85% of them.
No other mining lease on record is within 500 m of this site; 1 has applied within 5 km.
Where it is
Gaurabera, Chitarpur, Ramgarh, Jharkhand. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Change in Land Use of Rajrappa Ocp — lapsed, 350 m away
- Rajrappa Coal Washery — environmental approval granted, 1 km away
- Change in Land Use of Rajrappa Ocp — lapsed, 3.4 km away
- Expansion of the existing steel plant for final production of 315,000 TPA… — cleared for impact study, 8.2 km away
- Expansion of the existing 28692 TPA MS Billets plant for final production of… — under environmental review, 8.5 km away
- Expansion of the existing steel plant for final production of 1,98,000 TPA MS… — withdrawn, 8.5 km away
- Rola Stone Deposit (Area - 2.812 ha) — environmental approval granted, 8.8 km away
- Lodhma Stone Block — lapsed, 8.9 km away
More from Central Coalfields Limited in Ramgarh
- KHAS KARANPURA COAL MINE (Project Area: 232.13 HA, Capacity: 3.375 MTPA) — cleared for impact study
- Saunda D Mine — cleared for impact study
- Basantpur Tapin Coking Coal Washery — environmental approval granted
- Kedla Dania railway siding — under forest review
- Jhrakhand-Laiyo Ocp — lapsed
- Basantpur Tapin Coking Coal Washery — environmental approval granted
12 Central Coalfields projects in Ramgarh
All 66 Central Coalfields projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.