Project details
| Official title | Proposed Expansion of Rolling Mill (from 90,000 TPA to 1,15,200 TPA for Production of TMT Rebars (Hot Charging) along with Installation of 4×12 T Induction Furnace (1,18,000 TPA) by M/s. Saluja Metaliks Private Limited |
|---|---|
| Status | Lapsed |
| Status since | 13 Jun 2026 |
| Application filed | 1 May 2026 |
| Approval sought | Environmental approval |
| Application type | Expansion |
| Sector | Industry |
| Applicant | SALUJA METALIKS Private limited |
| Land area | 13.5 acres (5.5 ha) |
| Project cost | ₹58.3 crore |
| Village / locality | Turukdiha |
| Taluk / tehsil | Giridih |
| District | Giridih |
| State | Jharkhand |
| Location from | Site boundary on record |
| Our reference | WID-JH-02224 |
In context
29 applications in Giridih since January 2022 are in the same category (Industry): 20 approved, 4 filed or under review, and 5 withdrawn, lapsed or rejected. The approved ones took a median of 39 days from filing to approval. At 13.5 acres, this one is smaller than 83% of them.
31 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Turukdiha, Giridih, Jharkhand. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Environmental Clearance for Production of M.S Angle, Channel, Flats & Squares,… — lapsed, 400 m away
- Environmental Clearance for Enhancing the Production of Tmt Bars/Rods From… — environmental approval granted, 600 m away
- Environmental Clearance for Enhancing the Production of Tmt Bars/Rods From… — environmental approval granted, 600 m away
- Environmental Clearance for Enhancing the Production of Tmt Bars/Rods From… — cleared for impact study, 600 m away
- Change in Configuration of Induction Furnaces by replacing 1x4T + 2x10T to… — initial checks, 600 m away
- Expansion in existing Rolling Mill to increase production from 250000TPA to… — more information requested, 800 m away
- Expansion in existing Rolling Mill to increase production from 250000TPA to… — cleared for impact study, 800 m away
- Expansion of existing Rolling Mill from Production Capacity of TMT Bars -… — environmental approval granted, 900 m away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.