Quick answers
What is this project?
4/6 Lane (Green Field) access control expressway from Varanasi to Kolkata under Chatra South Forest Division from Km 207.600 to Km. 269.800 in the state of Jharkhand under Bharatmala Pariyojana Phase-II (Lot-9 Package-3) (Length – 62.200 Km) is a proposed road project in Edla, Simaria, Chatra, Jharkhand. It seeks 593.4 acres of forest land.
Who is building it?
The applicant is Ministry of Road Transport & Highways.
Has it been approved?
Not yet. The application is still under review: its status is “More information requested”, as of 27 Nov 2026.
Where is it?
In Edla, Simaria, Chatra, Jharkhand.
How big is it?
It has a stated cost of ₹2,064 crore and 593.4 acres (240.2 ha) of forest land.
When was it filed?
The application was filed on 22 Jan 2025.
Project details
| Official title | Development of 4/6 Lane (Green Field) access control expressway from Varanasi to Kolkata under Chatra South Forest Division from Km 207.600 to Km. 269.800 in the state of Jharkhand under Bharatmala Pariyojana Phase-II (Lot-9 Package-3) (Length – 62.200 Km) |
|---|---|
| Status | More information requested |
| Status since | 18 Nov 2026 |
| Application filed | 22 Jan 2025 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Roads & highways |
| Applicant | Ministry of Road Transport & Highways |
| Forest land | 593.4 acres (240.2 ha) |
| Project cost | ₹2,064 crore |
| Village / locality | Edla |
| Taluk / tehsil | Simaria |
| District | Chatra |
| State | Jharkhand |
| Location from | Site boundary on record |
| Our reference | WID-JH-02420 |
In context
12 applications in Chatra since January 2022 are in the same category (Roads & highways): 0 approved, 8 filed or under review, and 4 withdrawn, lapsed or rejected.
Where it is
Edla, Simaria, Chatra, Jharkhand. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- 4/6 Lane (Green Field) access control expressway from Varanasi to Kolkata… — more information requested, 11.7 km away
- 4/6 lane (green field) access control expressway from Varanasi to Kolkata… — lapsed, 13.4 km away
- Kerandari Coal Mining Project — more information requested, 40.6 km away
- Prepration of 11KV Line for Supply of Electricity for Phed(Wtp) From Tandwa… — lapsed, 44.5 km away
- Piparwar OCP Change in land Use 13.11 Ha — lapsed, 46.8 km away
- Piparwar OCP Change in land Use 28.22 Ha — lapsed, 46.9 km away
- Amendment in EC of Piparwar UG (Phase-I) — environmental approval granted, 47.1 km away
- Piparwar UG (Phase-I) — withdrawn, 47.1 km away
More from Ministry of Road Transport & Highways in Chatra
- 4/6 Lane (Green Field) access control expressway from Varanasi to Kolkata… — more information requested
- 4/6 lane (green field) access control expressway from Varanasi to Kolkata… — lapsed
- 4/6 lane (green field) access control expressway from Varanasi to Kolkata… — lapsed
- 4/6 lane (green field) access control expressway from Varanasi to Kolkata… — lapsed
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.