Quick answers
What is this project?
Prepration of 11KV Line for Supply of Electricity for Phed(Wtp) From Tandwa Pss Via Kalyanpur to Bachra is a lapsed power project in Karo, Tandwa, Chatra, Jharkhand. It seeks 988.4 acres of forest land.
Who is building it?
The applicant is Jharkhand Bijli Vitran Nigam Limited.
Has it been approved?
No. The application was lapsed on 4 Mar 2026, so it is no longer under consideration.
Where is it?
In Karo, Tandwa, Chatra, Jharkhand.
How big is it?
It has a stated cost of ₹59 lakh and 988.4 acres (400 ha) of forest land.
When was it filed?
The application was filed on 5 Jan 2026.
Project details
| Status | Lapsed |
|---|---|
| Status since | 4 Mar 2026 |
| Application filed | 5 Jan 2026 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Power |
| Applicant | Jharkhand Bijli Vitran Nigam Limited |
| Forest land | 988.4 acres (400 ha) |
| Project cost | ₹59 lakh |
| Village / locality | Karo |
| Taluk / tehsil | Tandwa |
| District | Chatra |
| State | Jharkhand |
| Location from | Site boundary on record |
| Our reference | WID-JH-02461 |
In context
8 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Karo, Tandwa, Chatra, Jharkhand. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Piparwar OCP Change in land Use 28.22 Ha — lapsed, 2.5 km away
- Amendment in EC of Piparwar UG (Phase-I) — environmental approval granted, 2.7 km away
- Piparwar UG (Phase-I) — withdrawn, 2.7 km away
- Piparwar UG (Phase-I) — environmental approval granted, 2.7 km away
- Piparwar UG (Phase-I) — cleared for impact study, 2.7 km away
- Piparwar OCP Change in land Use 13.11 Ha — lapsed, 2.7 km away
- Piparwar OCP Change in land Use 101.87 Ha — lapsed, 3.1 km away
- Ashok OCP 10 MTY — lapsed, 4.5 km away
All 3 Jharkhand Bijli Vitran Nigam projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.