Quick answers
What is 400 KV D/C 3 Ph QM Patratu - Chandil Transmission Line?
400 KV D/C 3 Ph QM Patratu - Chandil Transmission Line is a lapsed power project in Jarad, Patratu, Ramgarh, Jharkhand. The site covers 1,576.9 acres.
Who is building it?
The applicant is Jusnl Jamshedpur.
Has it been approved?
No. The application was lapsed on 4 Mar 2026, so it is no longer under consideration.
Where is it?
In Jarad, Patratu, Ramgarh, Jharkhand.
How big is it?
It has a stated cost of ₹450.2 crore; a site of 1,576.9 acres and 369.6 acres (149.6 ha) of forest land.
When was it filed?
The application was filed on 10 Jan 2026.
Project details
| Official title | Construction of 400 KV D/C 3 Ph QM Patratu - Chandil Transmission Line. |
|---|---|
| Status | Lapsed |
| Status since | 4 Mar 2026 |
| Application filed | 10 Jan 2026 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Power |
| Applicant | Jusnl Jamshedpur |
| Land area | 1,576.9 acres (638.1 ha) |
| Forest land | 369.6 acres (149.6 ha) |
| Project cost | ₹450.2 crore |
| Village / locality | Jarad |
| Taluk / tehsil | Patratu |
| District | Ramgarh |
| State | Jharkhand |
| Location from | Site boundary on record |
| Our reference | WID-JH-02565 |
In context
13 applications in Ramgarh since January 2022 are in the same category (Power): 3 approved, 6 filed or under review, and 4 withdrawn, lapsed or rejected. At 1,576.9 acres, this one is larger than 58% of them.
Where it is
Jarad, Patratu, Ramgarh, Jharkhand. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- 132 KV D/C Gola Silli Transmission Line — under forest review, 21.6 km away
- Widening / Strengthening and Reconstruction of Four Lane of Gola to Muri Road… — lapsed, 24.9 km away
- Chatak Stone Mine — environmental approval granted, 26.4 km away
- Expansion of the existing steel plant for final production of 315,000 TPA… — cleared for impact study, 26.5 km away
- Expansion of the existing 28692 TPA MS Billets plant for final production of… — under environmental review, 28.7 km away
- Expansion of the existing steel plant for final production of 1,98,000 TPA MS… — withdrawn, 28.7 km away
- Lolo Stone Block (Area 5.21 Ha or 12.87 Acre) — cleared for impact study, 30.3 km away
- Lolo Stone Block — withdrawn, 30.3 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.