Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 8 Feb 2025 |
| Application filed | 18 Sept 2024 |
| Approval sought | Environmental approval |
| Application type | Validity extension |
| Sector | Mining |
| Applicant | Mahavir Mining |
| Land area | 22.8 acres (9.2 ha) |
| Project cost | ₹1.3 crore |
| Village / locality | Parei (Parel) |
| Taluk / tehsil | Samba |
| District | Samba |
| State | Jammu and Kashmir |
| Location from | Site boundary on record |
| Our reference | WID-JK-00031 |
In context
23 applications in Samba since January 2022 are in the same category (Mining): 15 approved, 0 filed or under review, and 8 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 22.8 acres, this one is smaller than 70% of them.
No other mining lease on record is within 500 m of this site; 6 have applied within 5 km.
Where it is
Parei (Parel), Samba, Jammu and Kashmir. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Extension of Environment Clearance in favour of Shri Amit Gupta, S/O Shri… — environmental approval granted, 1.2 km away
- Minor Mineral (River Bed Material) Mining Project Block No. 3/3 (Block… — lapsed, 1.4 km away
- RBM (River Bed Material) Minor Mineral Block Mining Project, Block- 3/1 an… — environmental approval granted, 1.4 km away
- Minor Mineral Block Mining Project Block- 3/4 (Block Area 9.68 ha), Basantar… — lapsed, 2.5 km away
- RBM (River Bed Material) Minor Mineral Block Mining Project Block- 3/4 an area… — environmental approval granted, 2.5 km away
- Diversion of 0.0225 HA. of Forest Land for construction of Mobile Tower for… — lapsed, 3.8 km away
- River Bed mining Project Block no 3/5 Basantar upstream NH1A bridge ,Samba — environmental approval granted, 3.9 km away
- Construction and Maintenance of road from L024-(Link Route) Papar Abtara to… — more information requested, 6.3 km away
More from Mahavir Mining in Samba
- River Bed Mining Project at Block no 2/4 Basantar River ,Downstream NH-1A… — environmental approval granted
All 4 Mahavir Mining projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.