What is Developing? Open the mapMap

Environmental approval grantedMining · Samba, Jammu and Kashmir

River Bed Mining at block 3/2 Basantar river Upstream NH-1A bridge, District Samba

River Bed Mining at block 3/2 Basantar river Upstream NH-1A bridge, District Samba is an approved mining project in Parei (Parel), Samba, Jammu and Kashmir. The site covers 22.8 acres. Its stated project cost is ₹1.3 crore. As of 27 Nov 2026, its status is “Environmental approval granted” (since 8 Feb 2025).

See it on the live map All projects in Samba

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Project details

StatusEnvironmental approval granted
Status since8 Feb 2025
Application filed18 Sept 2024
Approval soughtEnvironmental approval
Application typeValidity extension
SectorMining
ApplicantMahavir Mining
Land area22.8 acres (9.2 ha)
Project cost₹1.3 crore
Village / localityParei (Parel)
Taluk / tehsilSamba
DistrictSamba
StateJammu and Kashmir
Location fromSite boundary on record
Our referenceWID-JK-00031

In context

23 applications in Samba since January 2022 are in the same category (Mining): 15 approved, 0 filed or under review, and 8 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 22.8 acres, this one is smaller than 70% of them.

No other mining lease on record is within 500 m of this site; 6 have applied within 5 km.

Where it is

Parei (Parel), Samba, Jammu and Kashmir. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Mahavir Mining in Samba

All 4 Mahavir Mining projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.