River Bed mining Project Block no 3/5 Basantar upstream NH1A bridge ,Samba

River Bed mining Project Block no 3/5 Basantar upstream NH1A bridge ,Samba is an approved mining project in Daboh, Samba, Jammu and Kashmir. The site covers 24.7 acres. Its stated project cost is ₹91 lakh. As of 27 Nov 2026, its status is “Environmental approval granted” (since 8 Feb 2025).

See it on the live map All projects in Samba

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Project details

StatusEnvironmental approval granted
Status since8 Feb 2025
Application filed17 Sept 2024
Approval soughtEnvironmental approval
Application typeValidity extension
SectorMining
ApplicantKaranvir Singh
Land area24.7 acres (10 ha)
Project cost₹91 lakh
Village / localityDaboh
Taluk / tehsilSamba
DistrictSamba
StateJammu and Kashmir
Location fromSite boundary on record
Our referenceWID-JK-00040

In context

23 applications in Samba since January 2022 are in the same category (Mining): 15 approved, 0 filed or under review, and 8 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 24.7 acres, this one is larger than 91% of them.

No other mining lease on record is within 500 m of this site; 6 have applied within 5 km.

Where it is

Daboh, Samba, Jammu and Kashmir. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.