Project details
| Official title | Proposal for Extension of Environment Clearance in favour of Shri Amit Gupta, S/O Shri Ashok Kumar Gupta Minor Mineral (River Bed Material) Project at Block No.3/3, (Revised Area – 8.11 ha.), Basantar River Upstream NH1A Bridge, Samba Village- Pangwal, Tehsil & District Samba, J&K (UT) |
|---|---|
| Status | Environmental approval granted |
| Status since | 25 Nov 2024 |
| Application filed | 7 Sept 2024 |
| Approval sought | Environmental approval |
| Application type | Validity extension |
| Sector | Mining |
| Applicant | Amit Gupta S/O Ashok Kumar |
| Land area | 20 acres (8.1 ha) |
| Project cost | ₹3.1 crore |
| Village / locality | Mulath |
| Taluk / tehsil | Samba |
| District | Samba |
| State | Jammu and Kashmir |
| Location from | Site boundary on record |
| Our reference | WID-JK-00121 |
In context
23 applications in Samba since January 2022 are in the same category (Mining): 15 approved, 0 filed or under review, and 8 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 20 acres, this one is smaller than 100% of them.
No other mining lease on record is within 500 m of this site; 6 have applied within 5 km.
Where it is
Mulath, Samba, Jammu and Kashmir. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- River Bed Mining at block 3/2 Basantar river Upstream NH-1A bridge, District… — environmental approval granted, 1.2 km away
- Minor Mineral Block Mining Project Block- 3/4 (Block Area 9.68 ha), Basantar… — lapsed, 1.3 km away
- RBM (River Bed Material) Minor Mineral Block Mining Project Block- 3/4 an area… — environmental approval granted, 1.3 km away
- Minor Mineral (River Bed Material) Mining Project Block No. 3/3 (Block… — lapsed, 2.2 km away
- RBM (River Bed Material) Minor Mineral Block Mining Project, Block- 3/1 an… — environmental approval granted, 2.2 km away
- River Bed mining Project Block no 3/5 Basantar upstream NH1A bridge ,Samba — environmental approval granted, 2.7 km away
- Diversion of 0.0225 HA. of Forest Land for construction of Mobile Tower for… — lapsed, 4.4 km away
- Const. of Gram Udyog Bhawan(Khadi Plaza)near Chichi Mata, Samba — lapsed, 5.4 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.