Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 25 Nov 2024 |
| Application filed | 7 Sept 2024 |
| Approval sought | Environmental approval |
| Application type | Validity extension |
| Sector | Mining |
| Applicant | Balvinder Singh S/O SH. Keemat Lal |
| Land area | 22.7 acres (9.2 ha) |
| Project cost | ₹1.3 crore |
| Village / locality | Suchi Pur |
| Taluk / tehsil | Samba |
| District | Samba |
| State | Jammu and Kashmir |
| Location from | Site boundary on record |
| Our reference | WID-JK-00034 |
In context
23 applications in Samba since January 2022 are in the same category (Mining): 15 approved, 0 filed or under review, and 8 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 22.7 acres, this one is smaller than 74% of them.
1 other mining lease has applied within 500 m of this site; together with this one they cover 45.2 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 6 mining leases have applied within 5 km.
Where it is
Suchi Pur, Samba, Jammu and Kashmir. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Minor Mineral (River Bed Material) Mining Project, Block-2/5, (Effective… — lapsed, 0 m away
- River Bed mining Project at Block no 2/6 Basantar River Downstream NH 1A… — environmental approval granted, 400 m away
- River Bed Material Project at Block No. 1/12 — lapsed, 1.2 km away
- River Bed Material Project at Block No. 1/12, (Area 9.11 ha.), Devak River… — lapsed, 1.2 km away
- (River Bed Material) Mining Project, Block No. 1/11, Village- Thalori Brahmna,… — environmental approval granted, 1.5 km away
- River Bed Mining Project at Block no 2/4 Basantar River ,Downstream NH-1A… — environmental approval granted, 2.1 km away
- Minor Mineral Block at Minor Mineral River Bed Material at Block No. 2/1,… — lapsed, 4.9 km away
- River Bed Mining at Block 1/6 ,Devak River Upstream Railway Bridge, Samba — environmental approval granted, 6.4 km away
More from Balvinder Singh S/O SH. Keemat Lal in Samba
- Minor Mineral RBM (River Bed Material), Block- 4/3 area-9.90 ha. at Bein River… — environmental approval granted
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.