What is Developing? Open the mapMap

Environmental approval grantedMining · Samba, Jammu and Kashmir

(River Bed Material) Mining Project, Block No. 1/11, Village- Thalori Brahmna, Tehsil-Vijaypur & District-Samba J&K (UT) (Area-9.66 ha.)

(River Bed Material) Mining Project, Block No. 1/11, Village- Thalori Brahmna, Tehsil-Vijaypur & District-Samba J&K (UT) (Area-9.66 ha.) is an approved mining project in Amwal, Samba, Jammu and Kashmir. The site covers 23.9 acres. Its stated project cost is ₹2.4 crore. As of 27 Nov 2026, its status is “Environmental approval granted” (since 28 Dec 2024).

See it on the live map All projects in Samba

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Project details

StatusEnvironmental approval granted
Status since28 Dec 2024
Application filed13 Sept 2024
Approval soughtEnvironmental approval
Application typeValidity extension
SectorMining
ApplicantBrinder Singh S/O Shre Keemat Lal
Land area23.9 acres (9.7 ha)
Project cost₹2.4 crore
Village / localityAmwal
Taluk / tehsilSamba
DistrictSamba
StateJammu and Kashmir
Location fromSite boundary on record
Our referenceWID-JK-00127

In context

23 applications in Samba since January 2022 are in the same category (Mining): 15 approved, 0 filed or under review, and 8 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 23.9 acres, this one is larger than 70% of them.

No other mining lease on record is within 500 m of this site; 6 have applied within 5 km.

Where it is

Amwal, Samba, Jammu and Kashmir. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Brinder Singh S/O Shre Keemat Lal in Samba

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.