Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 12 Jan 2026 |
| Application filed | 16 Sept 2024 |
| Approval sought | Environmental approval |
| Application type | Validity extension |
| Sector | Mining |
| Applicant | Kesari Nandan |
| Land area | 22.6 acres (9.1 ha) |
| Project cost | ₹1 crore |
| Village / locality | Bajawati |
| Taluk / tehsil | Samba |
| District | Samba |
| State | Jammu and Kashmir |
| Location from | Site boundary on record |
| Our reference | WID-JK-00169 |
In context
23 applications in Samba since January 2022 are in the same category (Mining): 15 approved, 0 filed or under review, and 8 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 22.6 acres, this one is smaller than 78% of them.
2 other mining leases have applied within 500 m of this site; together with this one they cover 68.3 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 6 mining leases have applied within 5 km.
Where it is
Bajawati, Samba, Jammu and Kashmir. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Minor Mineral (River Bed Material) Mining Project, Block-2/5, (Effective… — lapsed, 400 m away
- MINING PROJECT MINOR MINERAL (River Bed Material) Project at Block No.2/5,… — environmental approval granted, 400 m away
- River Bed Material Project at Block No. 1/12 — lapsed, 1.2 km away
- River Bed Material Project at Block No. 1/12, (Area 9.11 ha.), Devak River… — lapsed, 1.2 km away
- (River Bed Material) Mining Project, Block No. 1/11, Village- Thalori Brahmna,… — environmental approval granted, 1.7 km away
- River Bed Mining Project at Block no 2/4 Basantar River ,Downstream NH-1A… — environmental approval granted, 2.3 km away
- Minor Mineral Block at Minor Mineral River Bed Material at Block No. 2/1,… — lapsed, 5.1 km away
- River Bed Mining at Block 1/6 ,Devak River Upstream Railway Bridge, Samba — environmental approval granted, 6.8 km away
More from Kesari Nandan in Samba
- river Bed mining project at Block no 4/1,Bein River Upstream NH1A bridge ,Samba — environmental approval granted