Quick answers
What is this project?
Proposed New Steel manufacturing unit having capacity 1,80,000 TPA of Steel Billets/Ingots/TMT Bars (8mm-32mm) by installing two Induction Furnaces (2x25 TPH), one Concast and one rolling Mill (1X30 TPH) at Plot No. 22 & 23-SICOP-Industrial Estate, Sahar Logate, Kathua, Jammu & Kashmir by M/s German Steel Works is a proposed industrial project in Rakh Sarkar Palahi (Og), Kathua, Jammu and Kashmir. The site covers 4.5 acres.
Who is building it?
The applicant is German Steel Works.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 11 Nov 2024), as of 27 Nov 2026.
Where is it?
In Rakh Sarkar Palahi (Og), Kathua, Jammu and Kashmir.
How big is it?
It has a stated cost of ₹88.2 crore and a site of 4.5 acres.
When was it filed?
The application was filed on 1 Jul 2024.
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 11 Nov 2024 |
| Application filed | 1 Jul 2024 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | German Steel Works |
| Land area | 4.5 acres (1.8 ha) |
| Project cost | ₹88.2 crore |
| Village / locality | Rakh Sarkar Palahi (Og) |
| Taluk / tehsil | Kathua |
| District | Kathua |
| State | Jammu and Kashmir |
| Location from | Site boundary on record |
| Our reference | WID-JK-00039 |
In context
12 applications in Kathua since January 2022 are in the same category (Industry): 5 approved, 0 filed or under review, and 7 withdrawn, lapsed or rejected. At 4.5 acres, this one is smaller than 92% of them.
5 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Rakh Sarkar Palahi (Og), Kathua, Jammu and Kashmir. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed New Steel manufacturing unit having capacity 1,80,000 TPA of Steel… — lapsed, 0 m away
- M/s ROYAL ENTERPRISES PROPOSED API BULK DRUGS MANUFACTURING UNIT — lapsed, 450 m away
- Manufacturing of BOPET Films & PET Chips by M/s Aegios polyfilms private Limited — environmental approval granted, 1.6 km away
- River bed mining Project at Block 1 Kathua — environmental approval granted, 2.3 km away
- Link road from L064 Km 3rd to Bagra Kathua under NABARD RIDF-XXVIII — lapsed, 4.2 km away
- River Bed Mining Project at Block no 2,Sahar Khad ,kathua — environmental approval granted, 4.5 km away
- Water Supply Scheme Juthana Upper — forest land use approved, 7.3 km away
- Retrofitting of WSS Forelain East (Ghatti Badanal) — lapsed, 7.3 km away
More from German Steel Works in Kathua
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.