Quick answers
What is this project?
Manufacturing of BOPET Films & PET Chips by M/s Aegios polyfilms private Limited is an approved industrial project in Logate, Kathua, Jammu and Kashmir. The site covers 20.2 acres.
Who is building it?
The applicant is Aegios Polyfilms Private Limited.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 15 Jul 2025), as of 27 Nov 2026.
Where is it?
In Logate, Kathua, Jammu and Kashmir.
How big is it?
It has a stated cost of ₹24 crore and a site of 20.2 acres.
When was it filed?
The application was filed on 31 Dec 2024.
Project details
| Official title | Manufacturing of BOPET Films & PET Chips at Village: Logate, Tehsil & District- Kathua by M/s Aegios polyfilms private Limited |
|---|---|
| Status | Environmental approval granted |
| Status since | 15 Jul 2025 |
| Application filed | 31 Dec 2024 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Industry |
| Applicant | Aegios Polyfilms Private Limited |
| Land area | 20.2 acres (8.2 ha) |
| Project cost | ₹24 crore |
| Village / locality | Logate |
| Taluk / tehsil | Kathua |
| District | Kathua |
| State | Jammu and Kashmir |
| Location from | Site boundary on record |
| Our reference | WID-JK-00103 |
In context
12 applications in Kathua since January 2022 are in the same category (Industry): 5 approved, 0 filed or under review, and 7 withdrawn, lapsed or rejected. At 20.2 acres, this one is smaller than 58% of them.
5 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Logate, Kathua, Jammu and Kashmir. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed New Steel manufacturing unit having capacity 1,80,000 TPA of Steel… — lapsed, 1.6 km away
- Proposed New Steel manufacturing unit having capacity 1,80,000 TPA of Steel… — cleared for impact study, 1.6 km away
- M/s ROYAL ENTERPRISES PROPOSED API BULK DRUGS MANUFACTURING UNIT — lapsed, 1.9 km away
- River Bed Mining Project at Block no 2,Sahar Khad ,kathua — environmental approval granted, 3.1 km away
- River bed mining Project at Block 1 Kathua — environmental approval granted, 3.7 km away
- Link road from L064 Km 3rd to Bagra Kathua under NABARD RIDF-XXVIII — lapsed, 5.7 km away
- Satish kumar — lapsed, 6.9 km away
- Proposed Standalone Clinker Grinding Unit with Cement Production Capacity of… — cleared for impact study, 7.2 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.