Quick answers
What is this project?
Proposed New Steel manufacturing unit having capacity 1,80,000 TPA of Steel Billets/Ingots/TMT Bars (8mm-32mm) by installing two Induction Furnaces (2x25 TPH), one Concast and one rolling Mill (1X30 TPH) at Plot No. 22 & 23-SICOP-Industrial Estate, Sahar Logate, Kathua, Jammu & Kashmir by M/s German Steel Works is a lapsed industrial project in Chak Drab Khan, Kathua, Jammu and Kashmir. The site covers 4.5 acres.
Who is building it?
The applicant is German Steel Works.
Has it been approved?
No. The application was lapsed on 14 Oct 2026, so it is no longer under consideration.
Where is it?
In Chak Drab Khan, Kathua, Jammu and Kashmir.
How big is it?
It has a stated cost of ₹88.2 crore and a site of 4.5 acres.
When was it filed?
The application was filed on 18 Apr 2026.
Project details
| Status | Lapsed |
|---|---|
| Status since | 14 Oct 2026 |
| Application filed | 18 Apr 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Industry |
| Applicant | German Steel Works |
| Land area | 4.5 acres (1.8 ha) |
| Project cost | ₹88.2 crore |
| Village / locality | Chak Drab Khan |
| Taluk / tehsil | Kathua |
| District | Kathua |
| State | Jammu and Kashmir |
| Location from | Site boundary on record |
| Our reference | WID-JK-00366 |
In context
12 applications in Kathua since January 2022 are in the same category (Industry): 5 approved, 0 filed or under review, and 7 withdrawn, lapsed or rejected. At 4.5 acres, this one is smaller than 92% of them.
5 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Chak Drab Khan, Kathua, Jammu and Kashmir. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed New Steel manufacturing unit having capacity 1,80,000 TPA of Steel… — cleared for impact study, 0 m away
- M/s ROYAL ENTERPRISES PROPOSED API BULK DRUGS MANUFACTURING UNIT — lapsed, 450 m away
- Manufacturing of BOPET Films & PET Chips by M/s Aegios polyfilms private Limited — environmental approval granted, 1.6 km away
- River bed mining Project at Block 1 Kathua — environmental approval granted, 2.3 km away
- Link road from L064 Km 3rd to Bagra Kathua under NABARD RIDF-XXVIII — lapsed, 4.2 km away
- River Bed Mining Project at Block no 2,Sahar Khad ,kathua — environmental approval granted, 4.5 km away
- Water Supply Scheme Juthana Upper — forest land use approved, 7.3 km away
- Retrofitting of WSS Forelain East (Ghatti Badanal) — lapsed, 7.3 km away
More from German Steel Works in Kathua
- Proposed New Steel manufacturing unit having capacity 1,80,000 TPA of Steel… — cleared for impact study
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.