What is Developing? Open the mapMap

Environmental approval grantedMining · Kathua, Jammu and Kashmir

RBM (River Bed Mineral) Mining Project, Block No.:- 06, Revised Area: 8.94 ha. At Bhini River Down Stream Kishanpur Road Bridge, District:-Kathua (Plan-I) Jammu & Kashmir

RBM (River Bed Mineral) Mining Project, Block No.:- 06, Revised Area: 8.94 ha. At Bhini River Down Stream Kishanpur Road Bridge, District:-Kathua (Plan-I) Jammu & Kashmir is an approved mining project in Bathari, Billawar, Kathua, Jammu and Kashmir. The site covers 24.5 acres. Its stated project cost is ₹1.3 crore. As of 27 Nov 2026, its status is “Environmental approval granted” (since 16 Apr 2025).

See it on the live map All projects in Kathua

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

RBM (River Bed Mineral) Mining Project, Block No.:- 06, Revised Area: 8.94 ha. At Bhini River Down Stream Kishanpur Road Bridge, District:-Kathua (Plan-I) Jammu & Kashmir is an approved mining project in Bathari, Billawar, Kathua, Jammu and Kashmir. The site covers 24.5 acres.

Who is building it?

The applicant is Balvinder Singh S/O SH. Keemat Lal.

Has it been approved?

Yes. Its status is “Environmental approval granted” (since 16 Apr 2025), as of 27 Nov 2026.

Where is it?

In Bathari, Billawar, Kathua, Jammu and Kashmir.

How big is it?

It has a stated cost of ₹1.3 crore and a site of 24.5 acres.

When was it filed?

The application was filed on 12 Feb 2024.

Project details

StatusEnvironmental approval granted
Status since16 Apr 2025
Application filed12 Feb 2024
Approval soughtEnvironmental approval
Application typeValidity extension
SectorMining
ApplicantBalvinder Singh S/O SH. Keemat Lal
Land area24.5 acres (9.9 ha)
Project cost₹1.3 crore
Village / localityBathari
Taluk / tehsilBillawar
DistrictKathua
StateJammu and Kashmir
Location fromSite boundary on record
Our referenceWID-JK-00078

In context

25 applications in Kathua since January 2022 are in the same category (Mining): 21 approved, 0 filed or under review, and 4 withdrawn, lapsed or rejected. The approved ones took a median of 10 months from filing to approval. At 24.5 acres, this one is larger than 92% of them.

No other mining lease on record is within 500 m of this site; 6 have applied within 5 km.

Where it is

Bathari, Billawar, Kathua, Jammu and Kashmir. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.