Quick answers
What is this project?
Minor Mineral Block No 08 in Bhini River Downstream Kishanpur Road Bridge District Kathua (Plan III) JK UT(Resized area 5.87ha.) is an approved mining project in Bathari, Billawar, Kathua, Jammu and Kashmir. The site covers 14.5 acres.
Who is building it?
The applicant is Hira Singh.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 14 Sept 2026), as of 27 Nov 2026.
Where is it?
In Bathari, Billawar, Kathua, Jammu and Kashmir.
How big is it?
It has a stated cost of ₹1.2 crore and a site of 14.5 acres.
When was it filed?
The application was filed on 11 Aug 2026.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 14 Sept 2026 |
| Application filed | 11 Aug 2026 |
| Approval sought | Environmental approval |
| Application type | Validity extension |
| Sector | Mining |
| Applicant | Hira Singh |
| Land area | 14.5 acres (5.9 ha) |
| Project cost | ₹1.2 crore |
| Village / locality | Bathari |
| Taluk / tehsil | Billawar |
| District | Kathua |
| State | Jammu and Kashmir |
| Location from | Site boundary on record |
| Our reference | WID-JK-00324 |
In context
25 applications in Kathua since January 2022 are in the same category (Mining): 21 approved, 0 filed or under review, and 4 withdrawn, lapsed or rejected. The approved ones took a median of 10 months from filing to approval. At 14.5 acres, this one is smaller than 76% of them.
No other mining lease on record is within 500 m of this site; 6 have applied within 5 km.
Where it is
Bathari, Billawar, Kathua, Jammu and Kashmir. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Minor Mineral (River Bed Material) Mining Project, Block No. 9 in Bhini River… — environmental approval granted, 750 m away
- Water Supply Scheme Plail — lapsed, 1.1 km away
- River Bed Mineral (RBM) Mining Project Block-10, Revised Area-8.85 ha. At… — environmental approval granted, 1.5 km away
- Design, Supply, Installation and Commissioning of National Flag Mast at… — lapsed, 1.5 km away
- Tourist Reception Centre and Design and Supply Installation & Commissioning of… — lapsed, 1.5 km away
- Tourist Reception Centre and Design and Supply Installation & Commissioning of… — lapsed, 1.5 km away
- RBM (River Bed Mineral) Mining Project, Block No.:- 06, Revised Area: 8.94 ha.… — environmental approval granted, 1.6 km away
- Water Supply Scheme Plail — forest land use approved, 1.7 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.