Quick answers
What is Water Supply Scheme Plail?
Water Supply Scheme Plail is a lapsed water and irrigation project in Palehal, Basohli, Kathua, Jammu and Kashmir. The site covers 0.8 acres.
Who is building it?
The applicant is Chief Engineer Jal Shakti Vibhag.
Has it been approved?
No. The application was lapsed on 16 Mar 2023, so it is no longer under consideration.
Where is it?
In Palehal, Basohli, Kathua, Jammu and Kashmir.
How big is it?
It has a stated cost of ₹3.9 crore; a site of 0.8 acres and 2,240 m² of forest land.
When was it filed?
The application was filed on 10 Jul 2023.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Water Supply Scheme Plail
Project details
| Status | Lapsed |
|---|---|
| Status since | 16 Mar 2023 |
| Application filed | 10 Jul 2023 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Water & irrigation |
| Applicant | Chief Engineer Jal Shakti Vibhag |
| Land area | 3,200 m² |
| Forest land | 2,240 m² |
| Project cost | ₹3.9 crore |
| Village / locality | Palehal |
| Taluk / tehsil | Basohli |
| District | Kathua |
| State | Jammu and Kashmir |
| Location from | Site boundary on record |
| Our reference | WID-JK-01232 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 10 Jul 2023 (this page) | Lapsed | 0.8 acres | ₹3.9 crore |
| New project filed 10 May 2023 | Forest land use approved | 0.8 acres | ₹3.9 crore |
In context
125 applications in Kathua since January 2022 are in the same category (Water & irrigation): 74 approved, 6 filed or under review, and 44 withdrawn, lapsed or rejected. The approved ones took a median of 2.9 years from filing to approval. At 0.8 acres, this one is smaller than 66% of them.
13 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Palehal, Basohli, Kathua, Jammu and Kashmir. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Water Supply Scheme Plail — forest land use approved, 650 m away
- Minor Mineral Block No 08 in Bhini River Downstream Kishanpur Road Bridge… — environmental approval granted, 1.1 km away
- Minor Mineral (River Bed Material) Mining Project, Block No. 9 in Bhini River… — environmental approval granted, 1.3 km away
- River Bed Mineral (RBM) Mining Project Block-10, Revised Area-8.85 ha. At… — environmental approval granted, 1.9 km away
- RBM (River Bed Mineral) Mining Project, Block No.:- 06, Revised Area: 8.94 ha.… — environmental approval granted, 2.5 km away
- Design, Supply, Installation and Commissioning of National Flag Mast at… — lapsed, 2.5 km away
- Tourist Reception Centre and Design and Supply Installation & Commissioning of… — lapsed, 2.5 km away
- Tourist Reception Centre and Design and Supply Installation & Commissioning of… — lapsed, 2.5 km away
More from Chief Engineer Jal Shakti Vibhag in Kathua
- Water Supply Scheme Siada — lapsed
- Water Supply Scheme Athialta Part-2 — lapsed
- Water Supply Scheme Dinga Amb — lapsed
- Water Supply Scheme Dhalta — lapsed
- Water Supply Scheme Randood — lapsed
- Water Supply Scheme Sandhar Dodla — lapsed
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.