Quick answers
What is this project?
Minor Minerals (RBM) at Block No. 15, Area (9.16) ha, located at Bhini River Downstream Naj Bridge Bilawar (Plan-X) is an approved mining project in Billawar, Kathua, Jammu and Kashmir. The site covers 22.6 acres.
Who is building it?
The applicant is Kishori Lal.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 17 Apr 2025), as of 27 Nov 2026.
Where is it?
In Billawar, Kathua, Jammu and Kashmir.
How big is it?
It has a stated cost of ₹2 crore and a site of 22.6 acres.
When was it filed?
The application was filed on 25 Dec 2024.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 17 Apr 2025 |
| Application filed | 25 Dec 2024 |
| Approval sought | Environmental approval |
| Application type | Validity extension |
| Sector | Mining |
| Applicant | Kishori Lal |
| Land area | 22.6 acres (9.2 ha) |
| Project cost | ₹2 crore |
| Village / locality | Billawar |
| Taluk / tehsil | Billawar |
| District | Kathua |
| State | Jammu and Kashmir |
| Location from | Site boundary on record |
| Our reference | WID-JK-00149 |
In context
25 applications in Kathua since January 2022 are in the same category (Mining): 21 approved, 0 filed or under review, and 4 withdrawn, lapsed or rejected. The approved ones took a median of 10 months from filing to approval. At 22.6 acres, this one is larger than 64% of them.
No other mining lease on record is within 500 m of this site; 7 have applied within 5 km.
Where it is
Billawar, Kathua, Jammu and Kashmir. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- RIVER BED MINERAL (RBM) MINING PROJECT, Block-16, Area: 8.92 ha. At Bhini… — environmental approval granted, 800 m away
- Minor Minerals (RBM) in Bhini River at upstream painthal Bridge, Block-17 — cleared for impact study, 1.6 km away
- Water Supply Scheme Pallan Dharalta — forest land use approved, 2.4 km away
- River Bed Mineral (RMB) Mining Project Block No. 18, Revised area-7.89 ha. At… — environmental approval granted, 2.5 km away
- RBM (River Bed Mineral) Mining Project, Block No.:- 12, Area: 9.45 ha. At… — environmental approval granted, 2.6 km away
- River Bed Mineral (RBM) Mining Project Block-10, Revised Area-8.85 ha. At… — environmental approval granted, 4.1 km away
- Minor Mineral River Bed Mineral (RBM) Block-05, Area-8.18 ha. At Naj Nallah… — environmental approval granted, 4.4 km away
- Water Supply Scheme Upper Dhar — forest land use approved, 4.6 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.