What is Developing? Open the mapMap

Environmental approval grantedMining · Kathua, Jammu and Kashmir

RBM (River Bed Mineral) Mining Project, Block No.:- 12, Area: 9.45 ha. At Bhini River Down Stream Naj Bridge Billawar, Tehsil-Billawar, District:-Kathua (Plan-VII) Jammu & Kashmir

RBM (River Bed Mineral) Mining Project, Block No.:- 12, Area: 9.45 ha. At Bhini River Down Stream Naj Bridge Billawar, Tehsil-Billawar, District:-Kathua (Plan-VII) Jammu & Kashmir is an approved mining project in Billawar, Kathua, Jammu and Kashmir. The site covers 23.4 acres. Its stated project cost is ₹1.7 crore. As of 27 Nov 2026, its status is “Environmental approval granted” (since 2 Jun 2025).

See it on the live map All projects in Kathua

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

RBM (River Bed Mineral) Mining Project, Block No.:- 12, Area: 9.45 ha. At Bhini River Down Stream Naj Bridge Billawar, Tehsil-Billawar, District:-Kathua (Plan-VII) Jammu & Kashmir is an approved mining project in Billawar, Kathua, Jammu and Kashmir. The site covers 23.4 acres.

Who is building it?

The applicant is Varun Chaudhary S/O Shri Ramesh Lal.

Has it been approved?

Yes. Its status is “Environmental approval granted” (since 2 Jun 2025), as of 27 Nov 2026.

Where is it?

In Billawar, Kathua, Jammu and Kashmir.

How big is it?

It has a stated cost of ₹1.7 crore and a site of 23.4 acres.

When was it filed?

The application was filed on 2 Jun 2025.

Project details

StatusEnvironmental approval granted
Status since2 Jun 2025
Application filed2 Jun 2025
Approval soughtEnvironmental approval
Application typeValidity extension
SectorMining
ApplicantVarun Chaudhary S/O Shri Ramesh Lal
Land area23.4 acres (9.5 ha)
Project cost₹1.7 crore
Village / localityBillawar
Taluk / tehsilBillawar
DistrictKathua
StateJammu and Kashmir
Location fromSite boundary on record
Our referenceWID-JK-00251

In context

25 applications in Kathua since January 2022 are in the same category (Mining): 21 approved, 0 filed or under review, and 4 withdrawn, lapsed or rejected. The approved ones took a median of 10 months from filing to approval. At 23.4 acres, this one is larger than 68% of them.

No other mining lease on record is within 500 m of this site; 9 have applied within 5 km.

Where it is

Billawar, Kathua, Jammu and Kashmir. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.