What is Developing? Open the mapMap

Environmental approval grantedMining · Kathua, Jammu and Kashmir

RIVER BED MINERAL (RBM) MINING PROJECT, Block-16, Area: 8.92 ha. At Bhini River, Up Stream Painthal Bridge (Plan-XI), Tehsil-Billawar, District- Kathua, Jammu & Kashmir

RIVER BED MINERAL (RBM) MINING PROJECT, Block-16, Area: 8.92 ha. At Bhini River, Up Stream Painthal Bridge (Plan-XI), Tehsil-Billawar, District- Kathua, Jammu & Kashmir is an approved mining project in Bathari, Billawar, Kathua, Jammu and Kashmir. The site covers 22 acres. Its stated project cost is ₹1.3 crore. As of 27 Nov 2026, its status is “Environmental approval granted” (since 15 Jul 2025).

See it on the live map All projects in Kathua

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

RIVER BED MINERAL (RBM) MINING PROJECT, Block-16, Area: 8.92 ha. At Bhini River, Up Stream Painthal Bridge (Plan-XI), Tehsil-Billawar, District- Kathua, Jammu & Kashmir is an approved mining project in Bathari, Billawar, Kathua, Jammu and Kashmir. The site covers 22 acres.

Who is building it?

The applicant is Shri Ravi Kumar Gautam S/O Shri Madan Mohan.

Has it been approved?

Yes. Its status is “Environmental approval granted” (since 15 Jul 2025), as of 27 Nov 2026.

Where is it?

In Bathari, Billawar, Kathua, Jammu and Kashmir.

How big is it?

It has a stated cost of ₹1.3 crore and a site of 22 acres.

When was it filed?

The application was filed on 14 Feb 2024.

Project details

StatusEnvironmental approval granted
Status since15 Jul 2025
Application filed14 Feb 2024
Approval soughtEnvironmental approval
Application typeValidity extension
SectorMining
ApplicantShri Ravi Kumar Gautam S/O Shri Madan Mohan
Land area22 acres (8.9 ha)
Project cost₹1.3 crore
Village / localityBathari
Taluk / tehsilBillawar
DistrictKathua
StateJammu and Kashmir
Location fromSite area on record
Our referenceWID-JK-00173

In context

25 applications in Kathua since January 2022 are in the same category (Mining): 21 approved, 0 filed or under review, and 4 withdrawn, lapsed or rejected. The approved ones took a median of 10 months from filing to approval. At 22 acres, this one is larger than 52% of them.

No other mining lease on record is within 500 m of this site; 5 have applied within 5 km.

Where it is

Bathari, Billawar, Kathua, Jammu and Kashmir. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.