Quick answers
What is Water Supply Scheme Sarthan?
Water Supply Scheme Sarthan is a lapsed water and irrigation project in Athoon, Basohli, Kathua, Jammu and Kashmir. The site covers 1.6 acres.
Who is building it?
The applicant is Chief Engineer Jal Shakti Vibhag.
Has it been approved?
No. The application was lapsed on 15 Nov 2026, so it is no longer under consideration.
Where is it?
In Athoon, Basohli, Kathua, Jammu and Kashmir.
How big is it?
It has a stated cost of ₹6.9 crore; a site of 1.6 acres and 1.5 acres (0.6 ha) of forest land.
When was it filed?
The application was filed on 15 Dec 2023.
Project details
| Status | Lapsed |
|---|---|
| Status since | 15 Nov 2026 |
| Application filed | 15 Dec 2023 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Water & irrigation |
| Applicant | Chief Engineer Jal Shakti Vibhag |
| Land area | 1.6 acres (0.6 ha) |
| Forest land | 1.5 acres (0.6 ha) |
| Project cost | ₹6.9 crore |
| Village / locality | Athoon |
| Taluk / tehsil | Basohli |
| District | Kathua |
| State | Jammu and Kashmir |
| Location from | Site boundary on record |
| Our reference | WID-JK-00652 |
In context
125 applications in Kathua since January 2022 are in the same category (Water & irrigation): 74 approved, 6 filed or under review, and 44 withdrawn, lapsed or rejected. The approved ones took a median of 2.9 years from filing to approval. At 1.6 acres, this one is larger than 65% of them.
10 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Athoon, Basohli, Kathua, Jammu and Kashmir. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Constuction Tractor road from nau to Hatli road to Mohalla Kumar Chand to… — lapsed, 750 m away
- Road from L045-(Link Road) Ambughat to Bera, Length = 3.0 KM — more information requested, 1.4 km away
- 4G Saturation Project Athoon (Athialta) — forest land use approved, 1.9 km away
- Water Supply schme Rehalta — forest land use approved, 2.4 km away
- Water Supply Scheme Nowshera — forest land use approved, 3.7 km away
- Geotechnical Investigations for Ujh MPP — forest land use approved, 3.8 km away
- Water Supply Scheme Athialta — forest land use approved, 4 km away
- Bridges at Km 23.09 (Khattar 21.0 M Span), Km 27.075 (Nud 30.0 M Span), Km… — in-principle approval, conditions pending, 4.3 km away
More from Chief Engineer Jal Shakti Vibhag in Kathua
- Water Supply Scheme Siada — lapsed
- Water Supply Scheme Athialta Part-2 — lapsed
- Water Supply Scheme Dinga Amb — lapsed
- Water Supply Scheme Dhalta — lapsed
- Water Supply Scheme Randood — lapsed
- Water Supply Scheme Sandhar Dodla — lapsed
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.