Quick answers
What is this project?
50 mtr Span Steel Girder Pahribal-Takanwari Bridge over Nallah Sindh at Ganderbal is a lapsed road project in Shalla Bug, Ganderbal, Jammu and Kashmir. The site covers 4.7 acres.
Who is building it?
The applicant is Chief Engineer Pwd (R&b) Kashmir.
Has it been approved?
No. The application was lapsed on 6 Nov 2026, so it is no longer under consideration.
Where is it?
In Shalla Bug, Ganderbal, Jammu and Kashmir.
How big is it?
It has a stated cost of ₹14.9 crore; a site of 4.7 acres and 4.4 acres (1.8 ha) of forest land.
When was it filed?
The application was filed on 15 Jan 2024.
Project details
| Official title | Construction of 50 mtr Span Steel Girder Pahribal-Takanwari Bridge over Nallah Sindh at Ganderbal |
|---|---|
| Status | Lapsed |
| Status since | 6 Nov 2026 |
| Application filed | 15 Jan 2024 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Roads & highways |
| Applicant | Chief Engineer Pwd (R&b) Kashmir |
| Land area | 4.7 acres (1.9 ha) |
| Forest land | 4.4 acres (1.8 ha) |
| Project cost | ₹14.9 crore |
| Village / locality | Shalla Bug |
| Taluk / tehsil | Ganderbal |
| District | Ganderbal |
| State | Jammu and Kashmir |
| Location from | Site boundary on record |
| Our reference | WID-JK-00834 |
In context
10 applications in Ganderbal since January 2022 are in the same category (Roads & highways): 1 approved, 2 filed or under review, and 7 withdrawn, lapsed or rejected. At 4.7 acres, this one is larger than 50% of them.
Where it is
Shalla Bug, Ganderbal, Jammu and Kashmir. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Construction/Development of the permanent Campus for Central University of… — under environmental review, 7 km away
- Minor Mineral (River Bed Material) Mining Project Block-04, Under Construction… — lapsed, 10.3 km away
- Balance Portion of Pedestrain Walk path from Kondbal onwards Phase-Ist — lapsed, 10.5 km away
- Road From Km 4th Of Lar Waliwar Road To Tragbal at Lar Ganderbal — not approved, 11.6 km away
- Water Supply Scheme Chantan Gulabpora Waliwar — forest land use approved, 12.5 km away
- 93 MW New Ganderbal Hydro Electric Project — returned to applicant, 13.8 km away
- Road from Chuntwaliwar to Mohan Marg Lal Marg RD 3500 to RD 12000 at Lar… — not approved, 14.9 km away
- Road from Chuntwaliwar to Mohan Marg Lal Marg RD 3500 to RD 12000 at Lar… — not approved, 14.9 km away
More from Chief Engineer Pwd (R&b) Kashmir in Ganderbal
- Road from Chuntwaliwar to Mohan Marg Lal Marg RD 3500 to RD 12000 at Lar… — not approved
- Road from Chuntwaliwar to Mohan Marg Lal Marg RD 3500 to RD 12000 at Lar… — not approved
- Balance Portion of Pedestrain Walk path from Kondbal onwards Phase-Ist — lapsed
- Road From Km 4th Of Lar Waliwar Road To Tragbal at Lar Ganderbal — not approved
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.