Quick answers
What is this project?
Construction and Maintenance of Link Road from L052-(Link Road) KP Road KM 33rd RD 50m to Hukahard Package No JK01-4012, Length=3.50 KM Carriage way width- 3.75 m (Under New Technology, Waste Plastic) Complete Stage, PMGSY-IV, Batch-I of 2025-26 is a proposed road project in Bot-Kote, Pahalgam, Anantnag, Jammu and Kashmir. The site covers 6.1 acres.
Who is building it?
The applicant is PMGSY Division Anantnag.
Has it been approved?
Not yet. The application is still under review: its status is “Under forest review”, as of 27 Nov 2026.
Where is it?
In Bot-Kote, Pahalgam, Anantnag, Jammu and Kashmir.
How big is it?
It has a stated cost of ₹4.9 crore; a site of 6.1 acres and 2.6 acres (1 ha) of forest land.
When was it filed?
The application was filed on 19 Aug 2026.
Project details
| Status | Under forest review |
|---|---|
| Status since | 16 Nov 2026 |
| Application filed | 19 Aug 2026 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Roads & highways |
| Applicant | PMGSY Division Anantnag |
| Land area | 6.1 acres (2.5 ha) |
| Forest land | 2.6 acres (1 ha) |
| Project cost | ₹4.9 crore |
| Village / locality | Bot-Kote |
| Taluk / tehsil | Pahalgam |
| District | Anantnag |
| State | Jammu and Kashmir |
| Location from | Site boundary on record |
| Our reference | WID-JK-01165 |
In context
13 applications in Anantnag since January 2022 are in the same category (Roads & highways): 1 approved, 10 filed or under review, and 2 withdrawn, lapsed or rejected. At 6.1 acres, this one is larger than 75% of them.
34 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Bot-Kote, Pahalgam, Anantnag, Jammu and Kashmir. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Srichan — lapsed, 500 m away
- Wss Hukhard — forest land use approved, 500 m away
- Wss Srechan — lapsed, 600 m away
- WSS Hukhard — lapsed, 700 m away
- Mohmmad Ramzan Mir — application filed, 1 km away
- WSS Ladi — lapsed, 1.8 km away
- Ladi — more information requested, 1.9 km away
- Ladi — decision issued, 1.9 km away
More from PMGSY Division Anantnag in Anantnag
- Construction and Maintenance of Link Road from L051-(Link Road) BL road KM… — under wildlife review
- Construction and Maintenance of Link Road from L078-(Link Road)… — more information requested
- Construction and Maintenance of Link Road from L067-(Link road) Halwan… — more information requested
- Construction and Maintenance of Link Road from L045-(Link Road) Larnoo to… — under forest review
- Construction and Maintenance of Link Road from L051-(Link Road) BL road KM… — more information requested
- Construction and Maintenance of Link Road from L051-(Link Road) BL road KM… — withdrawn
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.