Quick answers
What is this project?
Construction and Maintenance of Link Road from L045-(Link Road) Larnoo to Pehlipora KM 2nd RD 200 m to Razkan, Stage Complete, Package No JK01-4002, Length=2.70 KM Carriage way width- 3.75 m (Under New Technology, Waste Plastic) PMGSY IV, Batch I, FY 2025-26 is a proposed road project in Nar Sanger, Kokernag, Anantnag, Jammu and Kashmir. The site covers 4 acres.
Who is building it?
The applicant is PMGSY Division Anantnag.
Has it been approved?
Not yet. The application is still under review: its status is “Under forest review”, as of 27 Nov 2026.
Where is it?
In Nar Sanger, Kokernag, Anantnag, Jammu and Kashmir.
How big is it?
It has a stated cost of ₹5.2 crore; a site of 4 acres and 3.2 acres (1.3 ha) of forest land.
When was it filed?
The application was filed on 12 Sept 2026.
Project details
| Status | Under forest review |
|---|---|
| Status since | 11 Nov 2026 |
| Application filed | 12 Sept 2026 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Roads & highways |
| Applicant | PMGSY Division Anantnag |
| Land area | 4 acres (1.6 ha) |
| Forest land | 3.2 acres (1.3 ha) |
| Project cost | ₹5.2 crore |
| Village / locality | Nar Sanger |
| Taluk / tehsil | Kokernag |
| District | Anantnag |
| State | Jammu and Kashmir |
| Location from | Site boundary on record |
| Our reference | WID-JK-01235 |
In context
13 applications in Anantnag since January 2022 are in the same category (Roads & highways): 1 approved, 10 filed or under review, and 2 withdrawn, lapsed or rejected. At 4 acres, this one is smaller than 67% of them.
26 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Nar Sanger, Kokernag, Anantnag, Jammu and Kashmir. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Wss Narsangri Kachwan — forest land use approved, 1.4 km away
- Wss Narsangri Kachwan — lapsed, 1.5 km away
- Wss Tsree — lapsed, 1.7 km away
- Wss Laigaripora Larnoo — lapsed, 2.4 km away
- WSS Laigaripora Larnoo — forest land use approved, 2.4 km away
- WSS Hallan — forest land use approved, 2.4 km away
- WSS Hallan — forest land use approved, 2.5 km away
- Wss Hallan — lapsed, 2.6 km away
More from PMGSY Division Anantnag in Anantnag
- Construction and Maintenance of Link Road from L051-(Link Road) BL road KM… — under wildlife review
- Construction and Maintenance of Link Road from L078-(Link Road)… — more information requested
- Construction and Maintenance of Link Road from L067-(Link road) Halwan… — more information requested
- Construction and Maintenance of Link Road from L052-(Link Road) KP Road KM… — under forest review
- Construction and Maintenance of Link Road from L051-(Link Road) BL road KM… — more information requested
- Construction and Maintenance of Link Road from L051-(Link Road) BL road KM… — withdrawn