What is Developing? Open the mapMap

Under wildlife reviewRoads & highways · Anantnag, Jammu and Kashmir

Construction and Maintenance of Link Road from L051-(Link Road) BL road KM 28th RD 950m to Jatpati Awoora, (Complete Stage) Package No JK01-4001, Length=2.60 KM Carriage way width- 3.75 m Under New Technology, Waste Plastic) , PMGSY-IV, Batch-I of 2025-26

Construction and Maintenance of Link Road from L051-(Link Road) BL road KM 28th RD 950m to Jatpati Awoora, (Complete Stage) Package No JK01-4001, Length=2.60 KM Carriage way width- 3.75 m Under New Technology, Waste Plastic) , PMGSY-IV, Batch-I of 2025-26 is a proposed road project in Awoora, Pahalgam, Anantnag, Jammu and Kashmir. The site covers 4.5 acres. Its stated project cost is ₹3.7 crore. As of 27 Nov 2026, its status is “Under wildlife review” (since 19 Nov 2026).

See it on the live map All projects in Anantnag

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Construction and Maintenance of Link Road from L051-(Link Road) BL road KM 28th RD 950m to Jatpati Awoora, (Complete Stage) Package No JK01-4001, Length=2.60 KM Carriage way width- 3.75 m Under New Technology, Waste Plastic) , PMGSY-IV, Batch-I of 2025-26 is a proposed road project in Awoora, Pahalgam, Anantnag, Jammu and Kashmir. The site covers 4.5 acres.

Who is building it?

The applicant is PMGSY Division Anantnag.

Has it been approved?

Not yet. The application is still under review: its status is “Under wildlife review”, as of 27 Nov 2026.

Where is it?

In Awoora, Pahalgam, Anantnag, Jammu and Kashmir.

How big is it?

It has a stated cost of ₹3.7 crore and a site of 4.5 acres.

When was it filed?

The application was filed on 19 Nov 2026.

Project details

StatusUnder wildlife review
Status since19 Nov 2026
Application filed19 Nov 2026
Approval soughtWildlife review
Application typeNew project
SectorRoads & highways
ApplicantPMGSY Division Anantnag
Land area4.5 acres (1.8 ha)
Project cost₹3.7 crore
Village / localityAwoora
Taluk / tehsilPahalgam
DistrictAnantnag
StateJammu and Kashmir
Location fromSite boundary on record
Our referenceWID-JK-03411

All filings for this project

This project has 3 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 19 Nov 2026 (this page)Under wildlife review4.5 acres₹3.7 crore
New project filed 11 Jul 2026More information requested4.5 acres₹3.7 crore
New project filed 17 Apr 2026Withdrawn4.5 acres₹3.7 crore

In context

13 applications in Anantnag since January 2022 are in the same category (Roads & highways): 1 approved, 10 filed or under review, and 2 withdrawn, lapsed or rejected. At 4.5 acres, this one is larger than 58% of them.

31 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Awoora, Pahalgam, Anantnag, Jammu and Kashmir. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from PMGSY Division Anantnag in Anantnag

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.