Quick answers
What is this project?
Road from Dhar road(kadia Nallah) upto Nilyat Bowli and Jamia Masjid is a proposed road project in Kilyal, Billawar, Kathua, Jammu and Kashmir. The site covers 7.3 acres.
Who is building it?
The applicant is Office of the Executive Engineer Pwd R&b Division Billawar.
Has it been approved?
Not yet. The application is still under review: its status is “More information requested”, as of 27 Nov 2026.
Where is it?
In Kilyal, Billawar, Kathua, Jammu and Kashmir.
How big is it?
It has a stated cost of ₹4.5 crore; a site of 7.3 acres and 1.5 acres (0.6 ha) of forest land.
When was it filed?
The application was filed on 14 Jul 2025.
Project details
| Official title | Construction of road from Dhar road(kadia Nallah) upto Nilyat Bowli and Jamia Masjid in village Kalyal (under NABARD RIDF XXIX) |
|---|---|
| Status | More information requested |
| Status since | 21 Nov 2026 |
| Application filed | 14 Jul 2025 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Roads & highways |
| Applicant | Office of the Executive Engineer Pwd R&b Division Billawar |
| Land area | 7.3 acres (3 ha) |
| Forest land | 1.5 acres (0.6 ha) |
| Project cost | ₹4.5 crore |
| Village / locality | Kilyal |
| Taluk / tehsil | Billawar |
| District | Kathua |
| State | Jammu and Kashmir |
| Location from | Site boundary on record |
| Our reference | WID-JK-01751 |
In context
23 applications in Kathua since January 2022 are in the same category (Roads & highways): 0 approved, 18 filed or under review, and 5 withdrawn, lapsed or rejected. At 7.3 acres, this one is smaller than 82% of them.
7 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Kilyal, Billawar, Kathua, Jammu and Kashmir. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Diversion of 0.0225 HA. of Forest Land for construction of Mobile Tower for… — lapsed, 600 m away
- Minor Mineral Block Kath-III, Ujh River Downstream Dhar-Udhampur Road Bridge — lapsed, 2.3 km away
- Water Supply Scheme Gurah Kalyal — lapsed, 2.7 km away
- Water Supply Scheme Gura Kalyal — forest land use approved, 2.7 km away
- Water Supply Scheme Roukhala Khatriala — forest land use approved, 3.6 km away
- 4G Saturation Project Goduflal — forest land use approved, 4.5 km away
- Water Supply Scheme Dhanu Parole — forest land use approved, 4.7 km away
- Water Supply Scheme Aglidhar 1 — forest land use approved, 5.4 km away
More from Office of the Executive Engineer Pwd R&b Division Billawar in Kathua
- Up-Gradation / Construction of road from Dhar road to High Security Prison — under forest review
- Up-Gradation of Road From Dhamlar to Dhar Dugnoo Via Huttar. — more information requested
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.