Quick answers
What is Water Supply Scheme Gurah Kalyal?
Water Supply Scheme Gurah Kalyal is a lapsed water and irrigation project in Kilyal, Billawar, Kathua, Jammu and Kashmir. The site covers 0.6 acres.
Who is building it?
The applicant is Chief Engineer Jal Shakti Vibhag.
Has it been approved?
No. The application was lapsed on 6 Mar 2023, so it is no longer under consideration.
Where is it?
In Kilyal, Billawar, Kathua, Jammu and Kashmir.
How big is it?
It has a stated cost of ₹13.7 crore; a site of 0.6 acres and 1,870 m² of forest land.
When was it filed?
The application was filed on 10 Jul 2023.
Project details
| Status | Lapsed |
|---|---|
| Status since | 6 Mar 2023 |
| Application filed | 10 Jul 2023 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Water & irrigation |
| Applicant | Chief Engineer Jal Shakti Vibhag |
| Land area | 2,600 m² |
| Forest land | 1,870 m² |
| Project cost | ₹13.7 crore |
| Village / locality | Kilyal |
| Taluk / tehsil | Billawar |
| District | Kathua |
| State | Jammu and Kashmir |
| Location from | Site boundary on record |
| Our reference | WID-JK-02547 |
In context
125 applications in Kathua since January 2022 are in the same category (Water & irrigation): 74 approved, 6 filed or under review, and 44 withdrawn, lapsed or rejected. The approved ones took a median of 2.9 years from filing to approval. At 0.6 acres, this one is smaller than 71% of them.
7 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Kilyal, Billawar, Kathua, Jammu and Kashmir. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Water Supply Scheme Gura Kalyal — forest land use approved, 50 m away
- Diversion of 0.0225 HA. of Forest Land for construction of Mobile Tower for… — lapsed, 2.2 km away
- Water Supply Scheme Roukhala Khatriala — forest land use approved, 2.3 km away
- Road from Dhar road(kadia Nallah) upto Nilyat Bowli and Jamia Masjid — more information requested, 2.7 km away
- 4G Saturation Project Goduflal — forest land use approved, 3.4 km away
- Water Supply Scheme Dhanu Parole — forest land use approved, 4.6 km away
- Minor Mineral Block Kath-III, Ujh River Downstream Dhar-Udhampur Road Bridge — lapsed, 4.9 km away
- WSS Lakhri — lapsed, 5.9 km away
More from Chief Engineer Jal Shakti Vibhag in Kathua
- Water Supply Scheme Siada — lapsed
- Water Supply Scheme Athialta Part-2 — lapsed
- Water Supply Scheme Dinga Amb — lapsed
- Water Supply Scheme Dhalta — lapsed
- Water Supply Scheme Randood — lapsed
- Water Supply Scheme Sandhar Dodla — lapsed
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.