Quick answers
What is Water Supply Scheme Roukhala Khatriala?
Water Supply Scheme Roukhala Khatriala is an approved water and irrigation project in Goduflal, Billawar, Kathua, Jammu and Kashmir. The site covers 1.1 acres.
Who is building it?
The applicant is Chief Engineer Jal Shakti Vibhag.
Has it been approved?
Yes. Its status is “Forest land use approved” (since 15 Apr 2026), as of 27 Nov 2026.
Where is it?
In Goduflal, Billawar, Kathua, Jammu and Kashmir.
How big is it?
It has a stated cost of ₹7.3 crore; a site of 1.1 acres and 3,390 m² of forest land.
When was it filed?
The application was filed on 30 May 2023.
Project details
| Status | Forest land use approved |
|---|---|
| Status since | 15 Apr 2026 |
| Application filed | 30 May 2023 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Water & irrigation |
| Applicant | Chief Engineer Jal Shakti Vibhag |
| Land area | 1.1 acres (0.5 ha) |
| Forest land | 3,390 m² |
| Project cost | ₹7.3 crore |
| Village / locality | Goduflal |
| Taluk / tehsil | Billawar |
| District | Kathua |
| State | Jammu and Kashmir |
| Location from | Site area on record |
| Our reference | WID-JK-00480 |
In context
125 applications in Kathua since January 2022 are in the same category (Water & irrigation): 74 approved, 6 filed or under review, and 44 withdrawn, lapsed or rejected. The approved ones took a median of 2.9 years from filing to approval. At 1.1 acres, this one is larger than 56% of them.
6 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Goduflal, Billawar, Kathua, Jammu and Kashmir. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- 4G Saturation Project Goduflal — forest land use approved, 1.1 km away
- Water Supply Scheme Gurah Kalyal — lapsed, 2.3 km away
- Water Supply Scheme Gura Kalyal — forest land use approved, 2.3 km away
- Water Supply Scheme Dhanu Parole — forest land use approved, 2.5 km away
- Diversion of 0.0225 HA. of Forest Land for construction of Mobile Tower for… — lapsed, 3 km away
- Road from Dhar road(kadia Nallah) upto Nilyat Bowli and Jamia Masjid — more information requested, 3.6 km away
- Water supply scheme Kohag Lahri — forest land use approved, 5.8 km away
- Minor Mineral Block Kath-III, Ujh River Downstream Dhar-Udhampur Road Bridge — lapsed, 5.9 km away
More from Chief Engineer Jal Shakti Vibhag in Kathua
- Water Supply Scheme Siada — lapsed
- Water Supply Scheme Athialta Part-2 — lapsed
- Water Supply Scheme Dinga Amb — lapsed
- Water Supply Scheme Dhalta — lapsed
- Water Supply Scheme Randood — lapsed
- Water Supply Scheme Sandhar Dodla — lapsed
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.