Forest land use approvedWater & irrigation · Kathua, Jammu and Kashmir

Retrofitting of Water Supply Scheme Basantpur under Jal Jeevan Mission

Retrofitting of Water Supply Scheme Basantpur under Jal Jeevan Mission is an approved water and irrigation project in Basant Pur, Kathua, Jammu and Kashmir. The site covers 0.1 acres. Its stated project cost is ₹6.4 crore. As of 27 Nov 2026, its status is “Forest land use approved” (since 11 Sept 2026).

See it on the live map All projects in Kathua

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Retrofitting of Water Supply Scheme Basantpur under Jal Jeevan Mission is an approved water and irrigation project in Basant Pur, Kathua, Jammu and Kashmir. The site covers 0.1 acres.

Who is building it?

The applicant is Chief Engineer Jal Shakti Vibhag.

Has it been approved?

Yes. Its status is “Forest land use approved” (since 11 Sept 2026), as of 27 Nov 2026.

Where is it?

In Basant Pur, Kathua, Jammu and Kashmir.

How big is it?

It has a stated cost of ₹6.4 crore; a site of 0.1 acres and 550 m² of forest land.

When was it filed?

The application was filed on 21 Sept 2023.

Project details

StatusForest land use approved
Status since11 Sept 2026
Application filed21 Sept 2023
Approval soughtForest land use
Application typeNew project
SectorWater & irrigation
ApplicantChief Engineer Jal Shakti Vibhag
Land area500 m²
Forest land550 m²
Project cost₹6.4 crore
Village / localityBasant Pur
Taluk / tehsilKathua
DistrictKathua
StateJammu and Kashmir
Location fromSite boundary on record
Our referenceWID-JK-02562

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 22 Sept 2023Under wildlife review0.1 acres₹6.4 crore
New project filed 21 Sept 2023 (this page)Forest land use approved0.1 acres₹6.4 crore

In context

125 applications in Kathua since January 2022 are in the same category (Water & irrigation): 74 approved, 6 filed or under review, and 44 withdrawn, lapsed or rejected. The approved ones took a median of 2.9 years from filing to approval. At 0.1 acres, this one is smaller than 100% of them.

7 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Basant Pur, Kathua, Jammu and Kashmir. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.