Project details
| Status | Initial checks |
|---|---|
| Status since | 25 Nov 2026 |
| Application filed | 24 Nov 2026 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Telecom |
| Applicant | Mahesh Nair |
| Land area | 200 m² |
| Forest land | 190 m² |
| Project cost | ₹25 lakh |
| Village / locality | Nalthi |
| Taluk / tehsil | Bhaderwah |
| District | Doda |
| State | Jammu and Kashmir |
| Location from | Site boundary on record |
| Our reference | WID-JK-02750 |
In context
23 applications in Doda since January 2022 are in the same category (Telecom): 12 approved, 9 filed or under review, and 2 withdrawn, lapsed or rejected. The approved ones took a median of 10 months from filing to approval. At 0 acres, this one is smaller than 100% of them.
Where it is
Nalthi, Bhaderwah, Doda, Jammu and Kashmir. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Hotel at Village-Nathi Tehsil- Bhadarwah District-Doda State- J & K… — lapsed, 5.1 km away
- Water Supply Scheme Sungli (LOM) — forest land use approved, 5.3 km away
- Water Supply Schame Sungali — more information requested, 5.6 km away
- Water Supply Schame Sungali — lapsed, 5.6 km away
- Water Supply Scheme Sungli — forest land use approved, 5.7 km away
- Water Supply Scheme Shankoja — forest land use approved, 6 km away
- Overhead OFC Laying route through forest area upto Banzala 4G Saturation Site — forest land use approved, 6.1 km away
- Link Road from Bhaderwah Chamba road Km 10th to Middle School Bhadrote — not approved, 6.7 km away
More from Mahesh Nair in Doda
- 4G Saturation Project at Village Jai Ghatti Ganthak and Bash Dhar — initial checks
- 4G Saturation Project at Village Hanga, Noori Thambli — initial checks
- 4G Saturation Project at Village Forest Block Suhanda (Shiva) — initial checks
- 4G Saturation Project at Village Seri, Neota Drudu — initial checks
- 4G Saturation Project at Village Tantna (Lodna) — more information requested
- 4G Saturation Project at Village Aul — more information requested
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.