Project details
| Status | Initial checks |
|---|---|
| Status since | 25 Nov 2026 |
| Application filed | 24 Nov 2026 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Telecom |
| Applicant | Mahesh Nair |
| Land area | 200 m² |
| Forest land | 190 m² |
| Project cost | ₹25 lakh |
| Village / locality | Sohanda |
| Taluk / tehsil | Doda |
| District | Doda |
| State | Jammu and Kashmir |
| Location from | Site boundary on record |
| Our reference | WID-JK-03381 |
In context
23 applications in Doda since January 2022 are in the same category (Telecom): 12 approved, 9 filed or under review, and 2 withdrawn, lapsed or rejected. The approved ones took a median of 10 months from filing to approval. At 0 acres, this one is smaller than 100% of them.
12 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Sohanda, Doda, Jammu and Kashmir. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Balance portion of 132 KV D/C Ramban-Khellani, 132 KV Khellani-Kishtwar and… — forest land use approved, 1.3 km away
- Construction of Road from Doli Mandir to Kotri Riae via Rewara — forest land use approved, 3 km away
- WSS Beoli-A — forest land use approved, 3.4 km away
- 4G Saturation Project Satwas & Shaya — forest land use approved, 3.6 km away
- Water Supply Scheme Arnora Ghat — lapsed, 3.7 km away
- 4G Saturation Project Chattergalla — forest land use approved, 4.3 km away
- Water Supply Scheme Birshalla Dashnan — forest land use approved, 4.4 km away
- Retrofitting of WSS Khellani — forest land use approved, 4.5 km away
More from Mahesh Nair in Doda
- 4G Saturation Project at Village Seoj Dhar — initial checks
- 4G Saturation Project at Village Jai Ghatti Ganthak and Bash Dhar — initial checks
- 4G Saturation Project at Village Hanga, Noori Thambli — initial checks
- 4G Saturation Project at Village Seri, Neota Drudu — initial checks
- 4G Saturation Project at Village Tantna (Lodna) — more information requested
- 4G Saturation Project at Village Aul — more information requested
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.