Project details
| Status | More information requested |
|---|---|
| Status since | 24 Nov 2026 |
| Application filed | 2 Nov 2026 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Telecom |
| Applicant | Mahesh Nair |
| Land area | 200 m² |
| Forest land | 190 m² |
| Project cost | ₹25 lakh |
| Village / locality | Al |
| Taluk / tehsil | Doda |
| District | Doda |
| State | Jammu and Kashmir |
| Location from | Site boundary on record |
| Our reference | WID-JK-03390 |
In context
23 applications in Doda since January 2022 are in the same category (Telecom): 12 approved, 9 filed or under review, and 2 withdrawn, lapsed or rejected. The approved ones took a median of 10 months from filing to approval. At 0 acres, this one is smaller than 100% of them.
15 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Al, Doda, Jammu and Kashmir. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Water Supply Scheme Aul Ugad — forest land use approved, 700 m away
- Water Supply Scheme Kulhand — forest land use approved, 2.1 km away
- Water Supply Scheme Dhar-B — forest land use approved, 2.3 km away
- Link Road From Nagan to Mukhtar Mahla Via Pandit Gam Bikhtayan — lapsed, 2.5 km away
- Water Supply Scheme Koti Basti — forest land use approved, 2.6 km away
- 4G Saturation Project at Village Ugad — more information requested, 3 km away
- Water Supply Kalihand — lapsed, 3 km away
- Construction and maintenance of road from L037-(Link) Bagla To Dudwah Harkhan,… — under forest review, 3.1 km away
More from Mahesh Nair in Doda
- 4G Saturation Project at Village Seoj Dhar — initial checks
- 4G Saturation Project at Village Jai Ghatti Ganthak and Bash Dhar — initial checks
- 4G Saturation Project at Village Hanga, Noori Thambli — initial checks
- 4G Saturation Project at Village Forest Block Suhanda (Shiva) — initial checks
- 4G Saturation Project at Village Seri, Neota Drudu — initial checks
- 4G Saturation Project at Village Tantna (Lodna) — more information requested
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.