Forest land use approvedWater & irrigation · Kathua, Jammu and Kashmir

Retrofitting of Water Supply scheme Baktha under Jal Jeevan Mission

Retrofitting of Water Supply scheme Baktha under Jal Jeevan Mission is an approved water and irrigation project in Rakh Hushiari, Kathua, Jammu and Kashmir. The site covers 0.3 acres. Its stated project cost is ₹9.9 crore. As of 27 Nov 2026, its status is “Forest land use approved” (since 30 Jul 2026).

See it on the live map All projects in Kathua

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Retrofitting of Water Supply scheme Baktha under Jal Jeevan Mission is an approved water and irrigation project in Rakh Hushiari, Kathua, Jammu and Kashmir. The site covers 0.3 acres.

Who is building it?

The applicant is Chief Engineer Jal Shakti Vibhag.

Has it been approved?

Yes. Its status is “Forest land use approved” (since 30 Jul 2026), as of 27 Nov 2026.

Where is it?

In Rakh Hushiari, Kathua, Jammu and Kashmir.

How big is it?

It has a stated cost of ₹9.9 crore; a site of 0.3 acres and 540 m² of forest land.

When was it filed?

The application was filed on 21 Sept 2023.

One of 2 filings for this project. The project's main page, with every filing and where each stands: Retrofitting of Water Supply scheme Baktha under Jal Jeevan Mission

Project details

StatusForest land use approved
Status since30 Jul 2026
Application filed21 Sept 2023
Approval soughtForest land use
Application typeNew project
SectorWater & irrigation
ApplicantChief Engineer Jal Shakti Vibhag
Land area1,100 m²
Forest land540 m²
Project cost₹9.9 crore
Village / localityRakh Hushiari
Taluk / tehsilKathua
DistrictKathua
StateJammu and Kashmir
Location fromSite boundary on record
Our referenceWID-JK-00516

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 22 Sept 2023Decision issued0.3 acres₹9.9 crore
New project filed 21 Sept 2023 (this page)Forest land use approved0.3 acres₹9.9 crore

In context

125 applications in Kathua since January 2022 are in the same category (Water & irrigation): 74 approved, 6 filed or under review, and 44 withdrawn, lapsed or rejected. The approved ones took a median of 2.9 years from filing to approval. At 0.3 acres, this one is smaller than 94% of them.

4 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Rakh Hushiari, Kathua, Jammu and Kashmir. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Chief Engineer Jal Shakti Vibhag in Kathua

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.