Quick answers
What is this project?
Up-Gradation of road from T01-Khunga to Kothi Jagir PWD road , Package no JK 19-3006 in PMGSY-III, Batch-I is a proposed road project in Batli, Ramban, Jammu and Kashmir. The site covers 56.6 acres.
Who is building it?
The applicant is Chief Engineer Pmgsy (Jkrrda) Jammu.
Has it been approved?
Not yet. The application is still under review: its status is “More information requested”, as of 27 Nov 2026.
Where is it?
In Batli, Ramban, Jammu and Kashmir.
How big is it?
It has a stated cost of ₹27.9 crore; a site of 56.6 acres and 33.8 acres (13.7 ha) of forest land.
When was it filed?
The application was filed on 18 Sept 2023.
Project details
| Status | More information requested |
|---|---|
| Status since | 20 Aug 2026 |
| Application filed | 18 Sept 2023 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Roads & highways |
| Applicant | Chief Engineer Pmgsy (Jkrrda) Jammu |
| Land area | 56.6 acres (22.9 ha) |
| Forest land | 33.8 acres (13.7 ha) |
| Project cost | ₹27.9 crore |
| Village / locality | Batli |
| Taluk / tehsil | Ramban |
| District | Ramban |
| State | Jammu and Kashmir |
| Location from | Site boundary on record |
| Our reference | WID-JK-03109 |
In context
57 applications in Ramban since January 2022 are in the same category (Roads & highways): 4 approved, 35 filed or under review, and 18 withdrawn, lapsed or rejected. At 56.6 acres, this one is larger than 91% of them.
25 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Batli, Ramban, Jammu and Kashmir. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Retrofitting of Water Supply Scheme Kanga (Additional Land Required) — forest land use approved, 950 m away
- Retrofitting of Water Supply Scheme Kanga — forest land use approved, 1 km away
- Construction Of Road from Gandhri to Tanger via Barnal — lapsed, 1.1 km away
- Improvement and Augmentation of Water Supply Scheme Surnikund to Kanga — forest land use approved, 1.3 km away
- Diversion of 1.8 Kms of 400 kV D/c Kishenpur-New Wanpoh — lapsed, 2.3 km away
- Diversion of 1.8 Kms of 400 kV D/c Kishenpur-New Wanpoh — forest land use approved, 2.3 km away
- Diversion of 1.8 Kms of 400 kV D/c Kishenpur-New Wanpoh — lapsed, 2.3 km away
- Link road from Thalwa to Batli under NABARD RIDF XXVIII — lapsed, 2.4 km away
More from Chief Engineer Pmgsy (Jkrrda) Jammu in Ramban
- L090-(Link road) Maghdar to Muranch via Nalli — more information requested
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.