Quick answers
What is Diversion of 1.8 Kms of 400 kV D/c Kishenpur-New Wanpoh?
Diversion of 1.8 Kms of 400 kV D/c Kishenpur-New Wanpoh is a lapsed power project in Badhol, Ramban, Jammu and Kashmir. The site covers 22.5 acres.
Who is building it?
The applicant is Power Grid Corporation of India (POWERGRID).
Has it been approved?
No. The application was lapsed on 10 Nov 2024, so it is no longer under consideration.
Where is it?
In Badhol, Ramban, Jammu and Kashmir.
How big is it?
It has a stated cost of ₹7 crore; a site of 22.5 acres and 17.1 acres (6.9 ha) of forest land.
When was it filed?
The application was filed on 11 Oct 2024.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Diversion of 1.8 Kms of 400 kV D/c Kishenpur-New Wanpoh
Project details
| Status | Lapsed |
|---|---|
| Status since | 10 Nov 2024 |
| Application filed | 11 Oct 2024 |
| Approval sought | Forest land use |
| Application type | Change of use |
| Sector | Power |
| Applicant | Power Grid Corporation of India (POWERGRID) |
| Land area | 22.5 acres (9.1 ha) |
| Forest land | 17.1 acres (6.9 ha) |
| Project cost | ₹7 crore |
| Village / locality | Badhol |
| Taluk / tehsil | Ramban |
| District | Ramban |
| State | Jammu and Kashmir |
| Location from | Site boundary on record |
| Our reference | WID-JK-02797 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Change of use filed 25 Apr 2025 | Lapsed | 22.5 acres | ₹7 crore |
| Change of use filed 11 Oct 2024 (this page) | Lapsed | 22.5 acres | ₹7 crore |
In context
6 applications in Ramban since January 2022 are in the same category (Power): 2 approved, 0 filed or under review, and 4 withdrawn, lapsed or rejected.
24 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Badhol, Ramban, Jammu and Kashmir. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Diversion of 1.8 Kms of 400 kV D/c Kishenpur-New Wanpoh — lapsed, 0 m away
- Diversion of 1.8 Kms of 400 kV D/c Kishenpur-New Wanpoh — forest land use approved, 0 m away
- Link road zero Morh to Padhiar Mohalla under NABARD RIDF XXXI — lapsed, 1 km away
- Retrofitting of Water Supply Scheme Kanga (Additional Land Required) — forest land use approved, 1.5 km away
- Link road from Thalwa to Batli under NABARD RIDF XXVIII — lapsed, 1.6 km away
- Retrofitting of Water Supply Scheme Kanga — forest land use approved, 2.2 km away
- Up-Gradation of road from T01-Khunga to Kothi Jagir PWD road , Package no JK… — more information requested, 2.3 km away
- Water Supply Scheme Kanga Pernote — more information requested, 2.5 km away
More from Power Grid Corporation of India (POWERGRID) in Ramban
- Diversion of 400KV Kishenpur-New Wanpoh Ckt 3&4 near tower no. 272 — lapsed
- Diversion of 400KV Kishenpur-New Wanpoh Ckt 3&4 near tower no. 272 — forest land use approved
- Diversion of 1.8 Kms of 400 kV D/c Kishenpur-New Wanpoh — forest land use approved
5 Power Grid Corporation of India projects in Ramban
All 45 Power Grid Corporation of India projects across India