Quick answers
What is Diversion of 1.8 Kms of 400 kV D/c Kishenpur-New Wanpoh?
Diversion of 1.8 Kms of 400 kV D/c Kishenpur-New Wanpoh is a lapsed power project in Badhol, Ramban, Jammu and Kashmir. The site covers 22.5 acres.
Who is building it?
The applicant is Power Grid Corporation of India (POWERGRID).
Has it been approved?
No. The application was lapsed on 24 Oct 2025, so it is no longer under consideration.
Where is it?
In Badhol, Ramban, Jammu and Kashmir.
How big is it?
It has a stated cost of ₹7 crore; a site of 22.5 acres and 17.1 acres (6.9 ha) of forest land.
When was it filed?
The application was filed on 25 Apr 2025.
Project details
| Status | Lapsed |
|---|---|
| Status since | 24 Oct 2025 |
| Application filed | 25 Apr 2025 |
| Approval sought | Forest land use |
| Application type | Change of use |
| Sector | Power |
| Applicant | Power Grid Corporation of India (POWERGRID) |
| Land area | 22.5 acres (9.1 ha) |
| Forest land | 17.1 acres (6.9 ha) |
| Project cost | ₹7 crore |
| Village / locality | Badhol |
| Taluk / tehsil | Ramban |
| District | Ramban |
| State | Jammu and Kashmir |
| Location from | Site boundary on record |
| Our reference | WID-JK-00935 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Change of use filed 25 Apr 2025 (this page) | Lapsed | 22.5 acres | ₹7 crore |
| Change of use filed 11 Oct 2024 | Lapsed | 22.5 acres | ₹7 crore |
In context
6 applications in Ramban since January 2022 are in the same category (Power): 2 approved, 0 filed or under review, and 4 withdrawn, lapsed or rejected.
24 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Badhol, Ramban, Jammu and Kashmir. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Diversion of 1.8 Kms of 400 kV D/c Kishenpur-New Wanpoh — forest land use approved, 0 m away
- Diversion of 1.8 Kms of 400 kV D/c Kishenpur-New Wanpoh — lapsed, 0 m away
- Link road zero Morh to Padhiar Mohalla under NABARD RIDF XXXI — lapsed, 1 km away
- Retrofitting of Water Supply Scheme Kanga (Additional Land Required) — forest land use approved, 1.5 km away
- Link road from Thalwa to Batli under NABARD RIDF XXVIII — lapsed, 1.6 km away
- Retrofitting of Water Supply Scheme Kanga — forest land use approved, 2.2 km away
- Up-Gradation of road from T01-Khunga to Kothi Jagir PWD road , Package no JK… — more information requested, 2.3 km away
- Water Supply Scheme Kanga Pernote — more information requested, 2.5 km away
More from Power Grid Corporation of India (POWERGRID) in Ramban
- Diversion of 400KV Kishenpur-New Wanpoh Ckt 3&4 near tower no. 272 — lapsed
- Diversion of 400KV Kishenpur-New Wanpoh Ckt 3&4 near tower no. 272 — forest land use approved
- Diversion of 1.8 Kms of 400 kV D/c Kishenpur-New Wanpoh — forest land use approved
5 Power Grid Corporation of India projects in Ramban
All 45 Power Grid Corporation of India projects across India
About this information