Quick answers
What is 4G Saturation Project Chanid?
4G Saturation Project Chanid is a proposed project in Seral Chowa, Majalta, Udhampur, Jammu and Kashmir. The site covers 0.1 acres.
Who is building it?
The applicant is Mahesh Nair.
Has it been approved?
Not yet. The application is still under review: its status is “Under wildlife review”, as of 27 Nov 2026.
Where is it?
In Seral Chowa, Majalta, Udhampur, Jammu and Kashmir.
How big is it?
It has a stated cost of ₹24 lakh and a site of 0.1 acres.
When was it filed?
The application was filed on 11 Nov 2023.
Project details
| Status | Under wildlife review |
|---|---|
| Status since | 11 Nov 2023 |
| Application filed | 11 Nov 2023 |
| Approval sought | Wildlife review |
| Application type | New project |
| Sector | Other |
| Applicant | Mahesh Nair |
| Land area | 300 m² |
| Project cost | ₹24 lakh |
| Village / locality | Seral Chowa |
| Taluk / tehsil | Majalta |
| District | Udhampur |
| State | Jammu and Kashmir |
| Location from | Site boundary on record |
| Our reference | WID-JK-03298 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 28 Dec 2023 | Lapsed | 0.1 acres | ₹24 lakh |
| New project filed 11 Nov 2023 (this page) | Under wildlife review | 0.1 acres | ₹24 lakh |
In context
67 applications in Udhampur since January 2022 are in the same category (Other): 0 approved, 14 filed or under review, and 47 withdrawn, lapsed or rejected. At 0.1 acres, this one is smaller than 91% of them.
Where it is
Seral Chowa, Majalta, Udhampur, Jammu and Kashmir. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- 4G Saturation Project Chanid — lapsed, 0 m away
- River Bed mining Projectat block no 1/5 Jammu — environmental approval granted, 7.3 km away
- River Bed Mining Project at Block 1/1 ,Tawi River Upstream Dhar-Udhampur Road… — environmental approval granted, 7.5 km away
- Wss Pinger , Jindrah Under Jjm — forest land use approved, 8.3 km away
- WSS DARSOO GUDDAR (Jammu Forest Division) — forest land use approved, 9.5 km away
- Wss Pinger — forest land use approved, 9.5 km away
- Road From L077 - (Link Road) Pardai to Upper Pardai, Length = 2.350 KM — under forest review, 10.4 km away
- Improvement and augmentation of WSS Darsoo Guddar — forest land use approved, 11.5 km away
More from Mahesh Nair in Udhampur
- 4G Saturation Project at Alu Top — more information requested
- 4G Saturation Project Kandal — forest land use approved
- 4G Saturation Project Lower Bali — forest land use approved
- Overhead Ofc Laying Route Through Forest Area Upto Kandrah 4g Saturation Site — forest land use approved
- 4G Saturation Project - Kossar — more information requested
- 4G Saturation Project KOSSAR — lapsed
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.