Quick answers
What is this project?
Expansion of Sugar Mill from 3500 TCD to 10000 TCD, Co-Generation Power Plant from 18 MW to 25 MW & 500 KLPD Molasses/Sugar Syrup based Distillery under Ethanol blending programme by M/s. Shree Kedarnath Sugar and Agro Products Ltd is a lapsed industrial project in Jalageri, Badami, Bagalkote, Karnataka. The site covers 88.9 acres.
Who is building it?
The applicant is Shree Kedarnath Sugar and Agro Products Limited.
Has it been approved?
No. The application was lapsed on 9 Jun 2025, so it is no longer under consideration.
Where is it?
In Jalageri, Badami, Bagalkote, Karnataka.
How big is it?
It has a stated cost of ₹1,022.3 crore and a site of 88.9 acres.
When was it filed?
The application was filed on 15 Jun 2023.
Project details
| Official title | Expansion of Sugar Mill from 3500 TCD to 10000 TCD, Co-Generation Power Plant from 18 MW to 25 MW & 500 KLPD Molasses/Sugar Syrup based Distillery under Ethanol blending programme at Village Jalageri & Ganganabudihal, Taluka Badami, District Bagalkot, Karnataka by M/s. Shree Kedarnath Sugar and Agro Products Ltd. |
|---|---|
| Status | Lapsed |
| Status since | 9 Jun 2025 |
| Application filed | 15 Jun 2023 |
| Approval sought | Environmental approval |
| Application type | Expansion |
| Sector | Industry |
| Applicant | Shree Kedarnath Sugar and Agro Products Limited |
| Land area | 88.9 acres (36 ha) |
| Project cost | ₹1,022.3 crore |
| Village / locality | Jalageri |
| Taluk / tehsil | Badami |
| District | Bagalkote |
| State | Karnataka |
| Location from | Site boundary on record |
| Our reference | WID-KA-00312 |
In context
61 applications in Bagalkote since January 2022 are in the same category (Industry): 39 approved, 11 filed or under review, and 11 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 88.9 acres, this one is larger than 56% of them.
11 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Jalageri, Badami, Bagalkote, Karnataka. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Expansion of Sugar Mill (3500 TCD to 15000 TCD), Co-generation Power Plant (15… — lapsed, 100 m away
- Expansion of Sugar Mill (3500 TCD to 15000 TCD), Co-generation Power Plant (15… — cleared for impact study, 100 m away
- 60 KLPD Molasses based distillery & 18 MW Co-generation power plant by M/s.… — cleared for impact study, 150 m away
- 60 KLPD Molasses based distillery & 18 MW Co-generation power plant by M/s.… — lapsed, 150 m away
- Proposed 500 KLPD Multi-feed (B-Heavy Molasses/C-Heavy Molasses/Cane… — environmental approval granted, 150 m away
- Proposed 500 KLPD Multi-feed (B-Heavy Molasses/C-Heavy Molasses/Cane… — returned to applicant, 200 m away
- Proposed 500 KLPD Multi-feed (B-Heavy Molasses/C-Heavy Molasses/Cane… — cleared for impact study, 200 m away
- Proposed 500 KLPD Multi-feed (B-Heavy Molasses/C-Heavy Molasses/Cane… — withdrawn, 200 m away
More from Shree Kedarnath Sugar and Agro Products Limited in Bagalkote
- Expansion of Sugar Mill (3500 TCD to 15000 TCD), Co-generation Power Plant (15… — lapsed
- Expansion of Sugar Mill (3500 TCD to 15000 TCD), Co-generation Power Plant (15… — cleared for impact study
- Proposed 500 KLPD Multi-feed (B-Heavy Molasses/C-Heavy Molasses/Cane… — withdrawn
- 60 KLPD Molasses based distillery & 18 MW Co-generation power plant by M/s.… — cleared for impact study
- 60 KLPD Molasses based distillery & 18 MW Co-generation power plant by M/s.… — lapsed
All 6 Shree Kedarnath Sugar projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.