Quick answers
What is this project?
60 KLPD Molasses based distillery & 18 MW Co-generation power plant by M/s. Shree Kedarnath Sugar and Agro Products Ltd is a proposed industrial project in Gangan Budihal, Badami, Bagalkote, Karnataka. The site covers 25.6 acres.
Who is building it?
The applicant is Shree Kedarnath Sugar and Agro Products Limited.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 14 Jul 2023), as of 27 Nov 2026.
Where is it?
In Gangan Budihal, Badami, Bagalkote, Karnataka.
How big is it?
It has a stated cost of ₹78 crore and a site of 25.6 acres.
When was it filed?
The application was filed on 14 Jul 2023.
Project details
| Official title | 60 KLPD Molasses based distillery & 18 MW Co-generation power plant at Village Jalageri & Ganganabudihal, Taluka Badami, District Bagalkote, Karnataka by M/s. Shree Kedarnath Sugar and Agro Products Ltd. |
|---|---|
| Status | Cleared for impact study |
| Status since | 14 Jul 2023 |
| Application filed | 14 Jul 2023 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | Shree Kedarnath Sugar and Agro Products Limited |
| Land area | 25.6 acres (10.4 ha) |
| Project cost | ₹78 crore |
| Village / locality | Gangan Budihal |
| Taluk / tehsil | Badami |
| District | Bagalkote |
| State | Karnataka |
| Location from | Site boundary on record |
| Our reference | WID-KA-00524 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Early planning filed 14 Jul 2023 (this page) | Cleared for impact study | 25.6 acres | ₹78 crore |
| Early planning filed 22 Jun 2023 | Lapsed | 25.6 acres | ₹424.4 crore |
In context
61 applications in Bagalkote since January 2022 are in the same category (Industry): 39 approved, 11 filed or under review, and 11 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 25.6 acres, this one is smaller than 89% of them.
10 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Gangan Budihal, Badami, Bagalkote, Karnataka. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- 60 KLPD Molasses based distillery & 18 MW Co-generation power plant by M/s.… — lapsed, 0 m away
- Expansion of Sugar Mill from 3500 TCD to 10000 TCD, Co-Generation Power Plant… — lapsed, 150 m away
- Proposed 500 KLPD Multi-feed (B-Heavy Molasses/C-Heavy Molasses/Cane… — environmental approval granted, 200 m away
- Proposed 500 KLPD Multi-feed (B-Heavy Molasses/C-Heavy Molasses/Cane… — returned to applicant, 200 m away
- Proposed 500 KLPD Multi-feed (B-Heavy Molasses/C-Heavy Molasses/Cane… — cleared for impact study, 200 m away
- Proposed 500 KLPD Multi-feed (B-Heavy Molasses/C-Heavy Molasses/Cane… — withdrawn, 200 m away
- Expansion of Sugar Mill (3500 TCD to 15000 TCD), Co-generation Power Plant (15… — lapsed, 250 m away
- Expansion of Sugar Mill (3500 TCD to 15000 TCD), Co-generation Power Plant (15… — cleared for impact study, 250 m away
More from Shree Kedarnath Sugar and Agro Products Limited in Bagalkote
- Expansion of Sugar Mill (3500 TCD to 15000 TCD), Co-generation Power Plant (15… — lapsed
- Expansion of Sugar Mill (3500 TCD to 15000 TCD), Co-generation Power Plant (15… — cleared for impact study
- Proposed 500 KLPD Multi-feed (B-Heavy Molasses/C-Heavy Molasses/Cane… — withdrawn
- Expansion of Sugar Mill from 3500 TCD to 10000 TCD, Co-Generation Power Plant… — lapsed
All 6 Shree Kedarnath Sugar projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.