What is Developing? Open the mapMap

Environmental approval grantedIndustry · Bagalkote, Karnataka

Proposed 500 KLPD Multi-feed (B-Heavy Molasses/C-Heavy Molasses/Cane Syrup/Grain) based Distillery by M/s. TruAlt Bioenergy Ltd. Unit-IV

Proposed 500 KLPD Multi-feed (B-Heavy Molasses/C-Heavy Molasses/Cane Syrup/Grain) based Distillery by M/s. TruAlt Bioenergy Ltd. Unit-IV is an approved industrial project in Jalageri, Badami, Bagalkote, Karnataka. The site covers 28.3 acres. Its stated project cost is ₹650 crore. As of 27 Nov 2026, its status is “Environmental approval granted” (since 1 Aug 2024).

See it on the live map All projects in Bagalkote

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Proposed 500 KLPD Multi-feed (B-Heavy Molasses/C-Heavy Molasses/Cane Syrup/Grain) based Distillery by M/s. TruAlt Bioenergy Ltd. Unit-IV is an approved industrial project in Jalageri, Badami, Bagalkote, Karnataka. The site covers 28.3 acres.

Who is building it?

The applicant is Trualt Bioenergy Limited.

Has it been approved?

Yes. Its status is “Environmental approval granted” (since 1 Aug 2024), as of 27 Nov 2026.

Where is it?

In Jalageri, Badami, Bagalkote, Karnataka.

How big is it?

It has a stated cost of ₹650 crore and a site of 28.3 acres.

When was it filed?

The application was filed on 3 Apr 2024.

Project details

Official titleProposed 500 KLPD Multi-feed (B-Heavy Molasses/C-Heavy Molasses/Cane Syrup/Grain) based Distillery along with 10 MW Co-generation Power Plant at Village Jalageri, Tehsil Badami, District Bagalkot, Karnataka by M/s. TruAlt Bioenergy Ltd. Unit-IV
StatusEnvironmental approval granted
Status since1 Aug 2024
Application filed3 Apr 2024
Approval soughtEnvironmental approval
Application typeNew project
SectorIndustry
ApplicantTrualt Bioenergy Limited
Land area28.3 acres (11.5 ha)
Project cost₹650 crore
Village / localityJalageri
Taluk / tehsilBadami
DistrictBagalkote
StateKarnataka
Location fromSite area on record
Our referenceWID-KA-02755

All filings for this project

This project has 3 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
Amendment filed 16 Sept 2025Returned to applicant28.3 acres₹650 crore
New project filed 3 Apr 2024 (this page)Environmental approval granted28.3 acres₹650 crore
Early planning filed 28 Jul 2023Cleared for impact study28.3 acres₹650 crore

In context

61 applications in Bagalkote since January 2022 are in the same category (Industry): 39 approved, 11 filed or under review, and 11 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 28.3 acres, this one is smaller than 80% of them.

6 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Jalageri, Badami, Bagalkote, Karnataka. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Trualt Bioenergy Limited in Bagalkote

All 10 Trualt Bioenergy projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.